2021-12-20 14:21:21PLAN
 REVIEW COMMENTS
  
 3RD REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING: COMMENTS BELOW FROM FIRST REVIEW
 WERE NOT ADDRESSED.
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) [THE ADDRESS ON THE ENGINEER'S WIND LOAD
 CALCULATIONS WAS NOT CORRECTED.] THE ADDRESS OF THE
 PROJECT ON THE ENGINEER'S WIND LOAD CALCULATIONS,
 FOUNDATION DRAWING AND THE ELECTRICAL DRAWING ARE
 INCORRECTLY SPECIFIED AS (2855 MARTIN LUTHER KING JR.
 BLVD, POMPANO BEACH, FL). THE STREET NAME IS SPELLED
 WRONG ON THE OTHER SIGN DRAWING. IT IS SPELLED MONCEARY
 AND THE CORRECT SPELLING IS MONCEAUX. PLEASE CORRECT
 THE ADDRESS OF THE PROJECT ON THE CONSTRUCTION
 DOCUMENTS. FBC AMEND.107.2.1