| Plan Review Notes For Permit 21030214 |
| Permit Number |
21030214 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-05-25 13:02:27 | 1) SUBMIT SPECIFICATIONS FOR THE LP TANK.THE TANK SHALL | | | BE ANCHORED IN ACCORDANCE WITH NFPA 58 SEC. 6.6.1.6.. | | | 2) SUBMIT MANUFACTURER?S SPECIFICATIONS AND | | | INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS. | | | REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING | | | SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON | | | THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING | | | INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR | | | CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR. FGC | | | SEC.410.1. | | | 3) PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR | | | THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO | | | BE INSTALLED TO PREVENT FLOTATION. NFPA 58 SEC. | | | 6.6.1.6. | | | 4) A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED PER | | | NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE | | | MONITORED PER NFPA 58 SEC.6.6.6.1 (J). SUBMIT DETAILS | | | ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS) & NUMBER | | | OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE CABLE. NFPA | | | 58 SEC. 6.17.3. | | | 5) A UNION IS REQUIRED WITHIN ON FOOT OF EITHER SIDE OF | | | THE MP REGULATOR. FBC-FUEL GAS SEC.410.2 (7). | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | |
|