2021-04-06 13:52:39CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2020 7TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020
 7TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION
 NFPA 99 = HEALTH CARE FACILITIES CODE
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 1ST REVIEW
  
 MEDICAL GAS COMMENTS: DENIED
  
 1. PER WPB FBC 107.2.1, PROVIDE RISER DIAGRAM OF NEW
 MEDICAL GAS PIPING SYSTEMS TO REFLECT THE PLAN VIEW.
  
 2. P1.1 MEDICAL GAS NOTES, NOTE 2: PER WPB FBC 107.2.1,
 DELETE ITEMS B) AND C).
  
 3. P1.1 MEDICAL GAS NOTES: ADD NOTE "BRAZING
 TECHNICIANS TO BE QUALIFIED AND CERTIFIED IN ACCORDANCE
 WITH NFPA 99-15 SECTION 5.1.10.11.11"
  
 4. P1.1 MEDICAL GAS NOTES: ADD NOTE "PROVIDE VALVE
 ID/SYSTEM IDENTIFICATION/COLOR CODING SPECIFICATION PER
 NFPA 99-15 SECTION 5.1.11 THROUGH 5.1.11.5 AND TABLE
 5.1.11 "
  
 5. P1.1 MEDICAL GAS NOTES: ADD TO NOTE 10; ITEM D)
 "SEGREGATED TOOL SETS SHALL BE INCORPORATED, IDENTIFIED
 AND MAINTAINED; ONE SET SHALL BE FOR OXYGEN AND ONE SET
 FOR VACUUM/WAGD".
 IN LIEU OF REQUIREMENT FOR SEGREGATED TOOL SETS,
 SPECIFY THAT VACUUM/WAGD PIPING FULLY COMPLY WITH NOTE
 9 AS REQUIRED FOR PRESSURIZED MEDICAL GAS SYSTEMS.
  
 PROVISO: PROVIDE MANUFACTURER'S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR MEDICAL GAS EQUIPMENT
 AND COMPONENTS. SEE WPB FBC 107.3.4.1 DEFERRED
 SUBMITTALS; FOR THE PURPOSES OF THIS SECTION, DEFERRED
 SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN
 THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION
 AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL
 WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL
 ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING
 OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS
 ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE
 BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL
 ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW
 THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A
 NOTATION INDICATING THAT THE DEFERRED SUBMITTAL
 DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL
 CONFORMANCE TO THE DESIGN OF THE BUILDING. THEY SHALL
 BE SUBMITTED TO, APPROVED BY THE BUILDING OFFICIAL AND
 ON SITE PRIOR TO FINAL INSPECTION. PROCEED AT YOUR OWN
 RISK.
 THIS MAY BE DONE BY NOTING SUCH IN THE RESPONSE LETTER
 TO THIS REVIEW.
  
 END OF COMMENTS.
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED
 AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
  
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 MOBILE 561-246-0882
 PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND
 THURSDAYS
  
 21030139 901 45TH ST
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved