| Date |
Text |
| 2021-04-22 08:38:20 | 04/22/21 1ST GAS REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. PLEASE SUBMIT CALCULATIONS FOR COMBUSTION AIR PER |
| | THE 2020 FBC RES. SEC. G2407.1 AND G2439.4 (CLOTHES |
| | DRYERS). IF LOUVER WILL BE USED. PLEASE SHOW THE |
| | LOCATION AND SIZE OF THE LOUVER(S) ON THE PLANS PER THE |
| | WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | 2. PLEASE SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | BUILDING'S EXTERIOR SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION PER THE 2020 FBC RES. SEC. G2421.1. |
| | |
| | 3. PLEASE SHOW THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS-STEEL TUBING (IF APPLICABLE) FOR |
| | EACH PIPE SIZE PER THE WPB AMENDMENTS TO THE FBC |
| | SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 4. PLEASE SUBMIT MANUFACTURER'S SPECIFICATION |
| | SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH 2020 FBC RES. SEC. G2408.1. |
| | |
| | 5. PLEASE LIST THE BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO THE 2020 FBC |
| | RES. SEC. G2413. |
| | |
| | 6. PLEASE SHOW THE DISTANCE FROM THE POINT OF DELIVERY |
| | (GAS METER / MP REGULATOR / LP TANK) TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER THE 2020 FBC |
| | RES. SEC. G2413.4.1. |
| | |
| | 7. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE |
| | INSTALLATION MANUALS FOR ALL GAS APPLIANCES/EQUIPMENT |
| | SHALL BE ONSITE AT THE TIME OF INSPECTION PER THE 2020 |
| | FBC RES. SEC. G2413.2 AND G2404.3. |
| | |
| | 8. THE GAS GRILL AND IT SEEMS TO BE IN A COVERED PATIO, |
| | IF SO PLEASE PROVIDE THE MANUFACTURE'S RECOMMENDATION |
| | FOR A VENTILATION HOOD PER THE 2020 FBC RES. SEC. |
| | G2408.1. |
| | |
| | 9. NEED A HARD CAP FOR FUTURE RANGE SHOW ON GAS |
| | ISOMERIC PER THE 2020 FBC RES. SEC. G2401.1.3. |
| | |
| | 10. IF THIS UNIT REQUIRES A CONDENSATE, IT WILL NEED TO |
| | BE 1' AWAY FROM STRUCTURE PER THE 2020 FBC SEC R318.5. |
| | |
| | 11. PLEASE SHOW THE LOCATION OF THE TANK-LESS WATER |
| | HEATER AND THE LOCATION AND DISTANCE OF ANY OPERABLE |
| | DOORS OR WINDOWS IN RELATION TO THE WATER HEATER. THE |
| | LOCATION OF THE WATER HEATER SHALL COMPLY WITH THE |
| | MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE HOUSE |
| | PLAN CAN BE HAND-DRAWN PER THE WPB AMENDMENTS TO THE |
| | FBC SEC. 107.2.1. INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | 12. PLEASE SHOW AND LABEL ALL UNIONS IN FRONT OF |
| | REGULATOR 1' OF EITHER SIDE PER THE 2020 FBC RES. SEC |
| | G2421.2. |
| | |
| | 13. PLEASE LABEL THE SHUT-OFF VALVE ON GAS ISOMERIC AND |
| | THEY SHALL HAVE ACCESS TO THEM PER THE 2020 FBC RES. |
| | SEC. G2420.5. |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |