| 2021-04-21 08:47:29 | 1) SHT.A-5 - THE NOTE ON THE PLAN THAT REFERS TO THE |
| | CLEARANCE AROUND THE WATER CLOSET STATES THAT THE 60 |
| | INCHES MINIMUM SHALL BE MEASURED FROM THE SIDE WALL OF |
| | THE WATER CLOSET YET THE PLAN VIEW APPEARS TO SHOW THE |
| | 60 INCHES MEASURED FROM THE REAR WALL OF THE WATER |
| | CLOSET. THE FLOOR PLAN IS CONFUSING AND VAGUE REGARDING |
| | THIS DIMENSION. CLARIFY. WPB AMEND. TO FBC SEC. 107.2.1 |
| | 2) SUBMIT A CONCRETE SLAB DETAIL SHOWING HOW THE SLAB |
| | CUTOUT FOR THE RELOCATION OR INSTALLATION OF PLUMBING |
| | LNES WILL BE REPAIRED TO MAINTAIN THE STRUCTURAL |
| | INTEGRITY OF THE SLAB. INDICATE THE SIZE OF REINFORCING |
| | BARS TO BE USED, THE EMBEDMENT DEPTH THAT THE REBAR |
| | WILL BE DOWELED INTO THE EXISTING SLAB, HOW THE DOWELS |
| | WILL BE SET IN THE EXISTING SLAB, AND THE SPACING ON |
| | CENTER OF THE DOWELS. SHOW THE THICKNESS OF THE |
| | EXISTING SLAB & THE REPAIR. A VAPOR BARRIER AND TERMITE |
| | POISONING IS REQUIRED.WPB AMEND. TO 2010 FBC |
| | SEC.107.2.1.2ND REQUEST. |
| | 3) SHT. P-1 - THE DRINKING FOUNTAIN DRAIN SHALL CONNECT |
| | TO THE HORIZONTAL BUILDING DRAIN DOWNSTREAM OF THE |
| | WATER CLOSETS. THE DRINKING FOUNTAIN IS STILL |
| | DISHARGING INTO A HORIZONTAL WET VENT. 2ND REQUEST. |
| | 4) SHT. P-1 - THE SANITARY RISER SHOWS AN 1- 1/2 INCH |
| | BRANCH VENT FOR A 4 INCH DRAIN.THE DIAMETER OF THE VENT |
| | SHALL BE NO LESS THAN THAN 1/2 THE DIAMETER OF THE |
| | DRAIN SERVED PER FBC-PLUMBING SEC. 906.1. |
| | 5) SHT. A-2 - DETAIL #11 SHOWS THE GRAB BEING MEASURED |
| | TO THE CENTERLINE OF THE GRAB BAR. THE HEIGHT OF THE |
| | GRAB BAR SHALL BE MEASURED TO THE TOP OF THE GRIPPING |
| | SURFACE. FBC-ACCESS. SEC.609.4. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |