| Date |
Text |
| 2021-06-29 15:55:23 | 21010992 1225 PALM BEACH LAKES BLVD |
| | |
| | |
| | PLUMBING COMMENTS: APPROVED |
| | |
| | ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD |
| | INSPECTOR'S APPROVAL |
| | |
| | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE |
| | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN |
| | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM |
| | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND |
| | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF |
| | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY |
| | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM |
| | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES |
| | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO |
| | AVOID VOIDING OF THE PERMIT. |
| | |
| | A SEPARATE SUB PERMIT IS REQUIRED FOR THE GREASE |
| | INTERCEPTOR |
| | |
| | A SEPARATE SUB PERMIT IS REQUIRED FOR THE BACKFLOW |
| | PREVENTER |
| | |
| | JERALD SMITH |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | EMAIL [email protected] |
| | MOBILE 561-243-0882 |
| | PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND |
| | THURSDAYS. |
| | |
| 2021-06-29 10:35:19 | HOLD FOR REVISED DRAWINGS FROM ENGINEER |
| 2021-06-24 15:47:13 | PLUMBING |
| | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| | 6TH ED, CHAPTER 1 |
| | WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL |
| | MANUAL REVISED 2017 |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 |
| | 7TH EDITION |
| | FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION |
| | FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION |
| | FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION |
| | NFPA 54 = NATIONAL FUEL GAS CODE |
| | NFPA 58 = LIQUIFIED PETROLEUM GAS CODE |
| | NFPA 96 = STANDARD FOR VENTILATION CONTROL AND FIRE |
| | PROTECTION OF COMMERCIAL COOKING OPERATIONS 2017 |
| | FAC= FLORIDA ADMINISTRATIVE CODE |
| | FS = FLORIDA STATUTES |
| | |
| | 21010992 1225 PALM BEACH LAKES BLVD |
| | |
| | 3RD REVIEW |
| | |
| | PLUMBING COMMENTS: DENIED |
| | |
| | 1.PROVIDED GREASE INTERCEPTOR DETAIL GS-7 ON P-8 DOES |
| | NOT CORRESPOND WITH THE WPB PUBLIC WORKS DEPT. STANDARD |
| | DETAIL GS-7 (CONCRETE) FOR GREASE INTERCEPTOR IN MY |
| | FILES. I WILL FORWARD PDF GS-7 GREASE INTERCEPTOR |
| | REDLINED FOR YOUR USE IN PREPARING A REVISED SUBMITTAL |
| | TO [email protected], [email protected] AND |
| | [email protected]. I APOLOGIZE IF THERE WAS A |
| | MISCOMMUNICATION ON MY PART REGARDING THE STANDARD |
| | DETAIL. |
| | IT IS NOTED THE GREASE TRAP CALCULATIONS HAVE BEEN |
| | INCLUDED ON P8.0. |
| | |
| | 2.ADDITIONALLY, PER WPB PUBLIC WORKS DEPT. CONCRETE |
| | GRAVITY SEWER SYSTEM-GREASE INTERCEPTOR STANDARD DETAIL |
| | GS-7-NOTE 4, A CONCRETE GREASE INTERCEPTOR SHALL HAVE A |
| | MINIMUM 750 GALLON/ MAXIMUM 1250 GALLON CAPACITY. WHEN |
| | REQUIRED EFFECTIVE CAPACITY IS GREATER THAN 1250 |
| | GALLONS, PROVIDE A MULTI-CHAMBERED INTERCEPTOR OR |
| | MULTIPLE INTERCEPTORS INSTALLED IN SERIES. P8.0 AND |
| | P1.0 CALL FOR A 1500 GALLON INTERCEPTOR. |
| | |
| | |
| | |
| | 3.REGARDING SUBMITTED CIVIL DRAWINGS; NOTE C-10 UTILITY |
| | PLAN INDICATES 6 INCH GREASY WASTE INTO AND OUT OF THE |
| | GREASE INTERCEPTOR AND A 6 INCH BUILDING SEWER; P1.0AND |
| | P5.0 INDICATE ALL 4 INCH SIZING. PER WPB FBC 107.2.1, |
| | RECONCILE CIVIL AND PLUMBING PLANS. |
| | |
| | 4. RESPONSE: TRAP PRIMER SHALL BE SPECIFIED AND |
| | DETAILED. THE TRAP PRIMER IS SPECIFIED ON P1.0 WITH THE |
| | FLOOR DRAIN FD-1. SEE DETAIL 1, SHEET P7.0. |
| | P1.0 IS COMPLIANT. SHEET P7.0 IS NOT IN THE NEW |
| | SUBMITTALS. |
| | |
| | 5. RESPONSE: CONDENSATE DRYWELL IS INDICATED ON P2.0 |
| | KEYNOTE 15 AND DETAILED ON P7.0 DETAIL #2. |
| | P1.0 IS COMPLIANT. SHEET P7.0 IS NOT IN THE NEW |
| | SUBMITTALS. |
| | |
| | 6.RESPONSE: FLOOR SINK IS IDENTIFIED ON P2.0 NEXT TO |
| | S-4 AND P4.0 IN THE SAME LOCATION. |
| | NOTED ON P2.0 AND P4.0; ISSUE IS ON P5.0 WHICH HAS S-4 |
| | AND S-2 IN OPPOSITE LOCATIONS FROM THAT ON P2.0 AND |
| | P4.0. PER WPB FBC 107.2.1, CORRECTLY IDENTIFY ON P5.0, |
| | S-2 AND S-4. |
| | |
| | 8.REGARDING RESPONSE: 6? GREASE WASTE REFERENCE SHALL |
| | BE REVISED TO 4? |
| | SECOND REQUEST: PER WPB FBC 107.2.1, ON P5.0, SHOW |
| | SIZE(S) OF SANITARY AND GREASY WASTE BUILDING DRAINS. |
| | |
| | |
| | 9. RESPONSE: HEAT TRACE PIPING IS SPECIFIED ON P2.0, |
| | KEYNOTE #7. THE DETAIL IS ON P7.0, DETAIL #3. |
| | P2.0 SPECIFICATION IS NOTED. SHEET P7.0 IS NOT IN THE |
| | NEW SUBMITTALS; NOTHING NOTED REGARDING INSULATION. |
| | |
| | |
| | |
| | END OF COMMENTS. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED |
| | AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS. |
| | |
| | JERALD SMITH |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | EMAIL [email protected] |
| | MOBILE 561-243-0882 |
| | PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND |
| | THURSDAYS. |