| 2021-06-29 15:59:36 | 21010992 1225 PALM BEACH LAKES BLVD |
| | |
| | |
| | GAS COMMENTS: APPROVED |
| | |
| | ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD |
| | INSPECTOR'S APPROVAL |
| | |
| | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE |
| | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN |
| | PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM |
| | THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND |
| | NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF |
| | PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY |
| | ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM |
| | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES |
| | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO |
| | AVOID VOIDING OF THE PERMIT. |
| | |
| | COMBUSTION AIR CALCULATIONS PROVIDED ON M-2.0 |
| | |
| | CITY OF WEST PALM BEACH GAS PIPING AFFIDAVIT OR |
| | MANOMETER TEST DOCUMENT REQUIRED AT JOBSITE FOR FINAL |
| | GAS INSPECTION. CALL 561-805-6692 FOR FURTHER |
| | INFORMATION |
| | |
| | THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES/EQUIPMENT SHALL BE AT JOB SITE FOR FINAL GAS |
| | INSPECTION |
| | |
| | A GAS SUB PERMIT IS REQUIRED |
| 2021-06-29 10:34:18 | HOLD FOR REVISED DRAWINGS FROM ENGINEER |
| 2021-06-24 16:04:58 | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| | 6TH ED, CHAPTER 1 |
| | WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL |
| | MANUAL REVISED 2017 |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 |
| | 7TH EDITION |
| | FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION |
| | FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION |
| | FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION |
| | NFPA 54 = NATIONAL FUEL GAS CODE |
| | NFPA 58 = LIQUIFIED PETROLEUM GAS CODE |
| | NFPA 96 = STANDARD FOR VENTILATION CONTROL AND FIRE |
| | PROTECTION OF COMMERCIAL COOKING OPERATIONS 2017 |
| | FAC= FLORIDA ADMINISTRATIVE CODE |
| | FS = FLORIDA STATUTES |
| | |
| | 21010992 1225 PALM BEACH LAKES BLVD |
| | |
| | 3RD REVIEW |
| | |
| | GAS COMMENTS: DENIED |
| | |
| | 1. PREVIOUS REQUEST: PER WPB FBC 107.2.1, SUBMIT |
| | CALCULATIONS FOR COMBUSTION AIR PER FBC FG 304.1. THIS |
| | IS NOT TO BE CONFUSED WITH MAKE-UP AIR. RESPONSE FROM |
| | ENGINEER; COMBUSTION AIR TO BE PROVIDED VIA DIRECT |
| | VENT. KEYNOTE 14 (THE NOTE IS 13) ON WASTE AND VENT |
| | PLAN P2.0 HAS BEEN REVISED TO REFLECT THIS. THIS |
| | ADDRESSES COMBUSTION AIR FOR THE TANKLESS WATER HEATERS |
| | BUT DOES NOT ADDRESS THE APPLIANCES ON THE COOKING |
| | LINE. PER WPB FBC 107.2.1, PROVIDE CALCULATIONS FOR |
| | COMBUSTION AIR PER FBC FG 304.1. THIS IS NOT TO BE |
| | CONFUSED WITH MAKE-UP AIR. |
| | |
| | RESPONSE: PER FBC FG 304.9, THE 455,000 BTU/H COOKING |
| | LINE REQUIRES 159.25 CFM OF MECHANICALLY SUPPLIED |
| | COMBUSTION AIR. THIS REQUIREMENT IS MET BY THE KITCHEN |
| | RTU PROVIDING 770 CFM OF OUTDOOR AIR TO THE SPACE. |
| | |
| | NEW COMMENT: PER WPB FBC 107.2.1, PROVIDE THIS |
| | INFORMATION ON THE PLANS. |
| | |
| | END OF COMMENTS. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED |
| | AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS. |
| | |
| | JERALD SMITH |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | EMAIL [email protected] |
| | MOBILE 561-243-0882 |
| | PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND |
| | THURSDAYS. |
| | |
| | 21010992 1225 PALM BEACH LAKES BLVD |
| | |