| 2021-05-25 15:06:51 | PLUMBING |
| | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| | 6TH ED, CHAPTER 1 |
| | WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL |
| | MANUAL REVISED 2017 |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 |
| | 7TH EDITION |
| | FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION |
| | FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION |
| | FBC FG = FLORIDA FUEL GAS CODE 2020 7TH EDITION |
| | NFPA 54 = NATIONAL FUEL GAS CODE |
| | NFPA 58 = LIQUIFIED PETROLEUM GAS CODE |
| | NFPA 96 = STANDARD FOR VENTILATION CONTROLAND FIRE |
| | PROTECTION OF COMMERCIAL COOKING OPERATIONS 2017 |
| | FAC= FLORIDA ADMINISTRATIVE CODE |
| | FS = FLORIDA STATUTES |
| | |
| | 21010992 1225 PALM BEACH LAKES BLVD |
| | |
| | 2ND REVIEW |
| | GENERAL NOTES |
| | A SEPARATE PLUMBING SUB-PERMIT IS REQUIRED FOR THE |
| | GREASE INTERCEPTOR. A PLAN WITH DETAIL OF THE GREASE |
| | INTERCEPTOR TO BE INSTALLED AND REQUIRED CONNECTIONS |
| | COMPLYING WITH CITY OF WEST PALM BEACH PUBLIC WORKS |
| | DEPARTMENT AND FBC PL SECTION 1003 SHALL BE SUBMITTED. |
| | SEE WPB PUBLIC WORKS DEPT. STANDARD DETAIL GS-7 |
| | (CONCRETE) AND GS-7.1 (HYDRO-MECHANICAL) FOR GUIDE. |
| | PLEASE INCLUDE THE GREASE TRAP CALCULATIONS ON THE SAME |
| | PAGE IN THE SUBMITTAL. |
| | A SEPARATE PLUMBING SUB-PERMIT IS REQUIRED FOR THE |
| | BACKFLOW PREVENTOR. |
| | |
| | PLUMBING COMMENTS: DENIED |
| | 1.SECOND REQUEST: PER FBC ACC 609.4, GRAB BARS SHALL BE |
| | INSTALLED IN A HORIZONTAL POSITION, 33 INCHES MINIMUM |
| | AND 36 INCHES MAXIMUM ABOVE THE FINISH FLOOR MEASURED |
| | TO THE TOP (NOT THE CENTER) OF THE GRIPPING SURFACE |
| | |
| | 2.GENERAL COMMENT; PER WPB FBC 107.2.1, PLAN DRAWINGS |
| | P2.0 AND P3.0 SHALL BE CONFIGURED AND RECONCILED WITH |
| | COINCIDING RISER DIAGRAMS ON P5.0. COMPLIED |
| | NEW COMMENT; P5.0 CORRECTLY SHOWS THE MEN?S TOILET ROOM |
| | WITH THE URINAL CONNECTING TO THE BUILDING DRAIN |
| | DOWNSTREAM OF THE WATER CLOSET, LAVATORY AND FLOOR |
| | DRAIN. P2.0 APPEARS TO SHOW THE WATER CLOSET |
| | DISCHARGING TO THE BUILDING DRAIN WITH THE URINAL |
| | SERVING AS THE VENT AND ALSO CONNECTING TO THE BUILDING |
| | DRAIN WITH THE LAVATORY WET VENTING IT AND THE FLOOR |
| | DRAIN (AS SHOWN ON P5.0). PER WPB FBC 107.2.1, CLARIFY. |
| | |
| | 3.PLAN SHEET P1.0 |
| | SECOND REQUEST: PER WPB FBC 107.2.1, SUBMIT SITE PLANS. |
| | TO BE CLEAR, CIVIL DRAWINGS SHOWING SEWER AND WATER ARE |
| | REQUIRED. |
| | SECOND REQUEST: PER WPB FBC 107.2.1, SPECIFY THE TRAP |
| | PRIMER AND PROVIDE A DETAIL FOR THE TRAP PRIMER. |
| | |
| | 4. PLAN SHEET P2.0 |
| | SECOND REQUEST: PROVIDE DETAIL FOR CONDENSATE DRYWELL |
| | |
| | 5.P4.0 |
| | NEW COMMENT: REGARDING S-4 PEDESTAL SINK; ENGINEER |
| | RESPONSE IS THAT SINK IS FOR FOOD PREP (NOTED ON |
| | REVISED SCHEDULE P1.0) AND THAT THE DRAIN IS REVISED TO |
| | A FLOOR SINK CONNECTION. PER WPB FBC 107.2.1, PROVIDE |
| | THE FOLLOWING: |
| | IDENTIFY THE FLOOR SINK ON P2.0 AND P5.0 |
| | PROVIDE A DETAIL OF THE SINK, FLOOR SINK AND SIZED |
| | INDIRECT WASTE THROUGH AN AIR GAP SHOWING COMPLIANCE |
| | WITH FBC PL 802.1.1 |
| | ON P1.0 FIXTURE SCHEDULE INDICATE INDIRECT FOR WASTE |
| | |
| | 6.P6.0 |
| | NEW COMMENT: PER WPB FBC 107.2.1, INDICATE ON P6.0, |
| | DETAIL 3 THAT THE FOOT PEDAL IS FOR S-4 OR ON P1.0, S-4 |
| | DESCRIPTION , ADD FOOT PEDALS AND REFER TO P6.0/DETAIL |
| | 3. |
| | |
| | 7.SEE PLAN SHEET A3.0: |
| | SECOND REQUEST; PER WPB FBC 107.2.1, PROVIDE |
| | CALCULATIONS AND SIZING FOR VERTICAL LEADERS AND |
| | HORIZONTAL GUTTERS. TO BE CLEAR, SHOW THE CALCULATIONS |
| | AND THE SIZING ON THE PLAN. ADDITIONALLY, INDICATE |
| | SQUARE FOOTAGE AND GPM OF AREAS BEING DRAINED AND |
| | INDICATE ON THE PLAN, GUTTER AND DOWNSPOUT SIZE. NOTES |
| | 11, 13 AND 14 ON A3.0 ARE ACKNOWLEDGED. |
| | NEW COMMENT: AS THERE IS NO STORM PIPING IN THE |
| | BUILDING, PER WPB FBC 107.2.1, DELETE REFERENCES TO |
| | STORM PIPING, ROOF DRAINS, OVERFLOW DRAINS, DOWNSPOUT |
| | NOZZLES, ETC. IN THE FIXTURE SCHEDULE(P1.0) AND WASTE & |
| | VENT NOTES (P2.0). |
| | |
| | NEW COMMENTS: |
| | |
| | 1. P5.0 INDICATES 6 INCH GREASY WASTE IN THE WASTE/VENT |
| | LINE LEGEND. WILL THE GREASE INTERCEPTOR COME FROM THE |
| | MANUFACTURER WITH INLETS/OUTLETS SIZED TO ACCOMMODATE |
| | THE 6 INCH DRAIN; WILL THE CIVIL DRAWINGS BE SIZED TO |
| | RECEIVE SAID SIZE. ADDITIONALLY, P1.0 PLUMBING FIXTURE |
| | SUMMARY INDICATES 4 INCH GREASY WASTE AS WELL AS 4 INCH |
| | SANITARY WASTE. PER WPB FBC 107.2.1, CLARIFY. PER WPB |
| | FBC 107.2.1, ON P5.0, SHOW SIZE(S) OF SANITARY AND |
| | GREASY WASTE BUILDING DRAINS. |
| | |
| | 2. PER WPB FBC 107.2.1, PROVIDE PIPE HANGER DETAIL WITH |
| | A NOTE STATING, "HORIZONTAL PIPE SHALL BE SUPPORTED IN |
| | ACCORDANCE WITH FBC PL TABLE 308.5." |
| | |
| | 3. REGARDING S-3 THREE-COMPARTMENT SINK; IDENTIFY IN |
| | FIXTURE SCHEDULE DESCRIPTION IF THIS IS FOOD PREP OR |
| | POT WASH. IF FOOD PREP, PROVIDE A DETAIL OF THE |
| | THREE-COMPARTMENT SINK, FLOOR SINK AND SIZED INDIRECT |
| | WASTE PIPES THROUGH AN AIR GAP SHOWING COMPLIANCE WITH |
| | FBC PL 802.1.1. EACH WELL OF A MULTIPLE-COMPARTMENT |
| | SINK SHALL DISCHARGE INDEPENDENTLY TO THE WASTE |
| | RECEPTOR. |
| | |
| | 4. PER WPB FBC 107.2.1, AS A KITCHEN EQUIPMENT PLUMBING |
| | FIXTURES NOTED ON P1.0 FIXTURE SCHEDULE (S-1, S-2, S-3 |
| | AND S-4) ARE INCOMPLETE IN DESCRIPTION, PROVIDE NOTE |
| | FOR SAID ITEMS, REFERRING TO A2.1 EQUIPMENT SCHEDULE; |
| | SINKS AND DISHWASHERS FOR FAUCETS/ACCESSORIES (I.E. |
| | FAUCET FOR S-2) INFORMATION. |
| | |
| | |
| | 5. P2.0 NOTE 9. PER WPB FBC 107.2.1, PROVIDE |
| | SPECIFICATION, POWER SOURCE AND DETAIL FOR HEAT TRACE. |
| | YOU CALL FOR HEAT TRACE APPLIED TO UNDERGROUND GREASY |
| | WASTE BELOW FREEZER/COOLER BUT DON?T CALL OUT ANY SORT |
| | OF INSULATION. PER WPB FBC 107.2.1, CLARIFY. |
| | |
| | 6. P2.0 NOTE 12. DETAIL DESCRIBED IS NOT SHOWN. PER WPB |
| | FBC 107.2.1, CLARIFY. |
| | |
| | 7. PER WPB FBC 107.2.1, PROVIDE A DETAIL OF THE |
| | BACKFLOW PREVENTER (BFP-1). INCLUDE SUPPORTS, STRAINER, |
| | RELIEF VENT DISCHARGE PIPING WITH AIR GAP TO FLOOR SINK |
| | OR HUB DRAIN (TO SANITARY, NOT GREASY WASTE). COMPLY |
| | WITH MANUFACTURER?S RECOMMENDATIONS PER FBC PL 301.7. |
| | SEE EXCERPTS FROM WATTS INSTALLATION, MAINTENANCE, & |
| | REPAIR SERIES 009 AND LF009 REDUCED PRESSURE ZONE |
| | ASSEMBLIES RP/IS-009 BELOW |
| | A.INDOORS ? FIGURE 1 FOR INDOOR INSTALLATIONS, IT IS |
| | IMPORTANT THAT THE ASSEMBLY BE EASILY ACCESSIBLE TO |
| | FACILITATE TESTING AND SERVICING. IF IT IS LOCATED IN A |
| | LINE CLOSE TO A WALL, BE SURE THE TEST COCKS ARE EASILY |
| | ACCESSIBLE. A DRAIN LINE AND AIR GAP (SEE LITERATURE |
| | ES-AG/EL/TC) SHOULD BE PIPED FROM THE RELIEF VALVE |
| | CONNECTION AS SHOWN, WHERE EVIDENCE OF DISCHARGE WILL |
| | BE CLEARLY VISIBLE AND SO THAT WATER DAMAGE WILL NOT |
| | OCCUR. THEREFORE, NEVER INSTALL IN CONCEALED LOCATIONS. |
| | B.WE RECOMMEND A STRAINER BE INSTALLED AHEAD OF 009 AND |
| | LF009 SERIES ASSEMBLIES TO PROTECT THE INTERNAL |
| | COMPONENTS FROM UNNECESSARY FOULING. |
| | |
| | END OF COMMENTS. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED |
| | AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS. |
| | |
| | JERALD SMITH |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | EMAIL [email protected] |
| | MOBILE 561-243-0882 |
| | PLEASE NOTE THAT I TYPICALLY WORK ON TUESDAYS AND |
| | THURSDAYS. |