| 2021-02-23 13:18:27 | NEW SFR |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) PLEASE SHOW THE LOCATION OF THE SMOKE ALARMS PER FBC |
| | R314.3 |
| | 2) CODE IN EFFECT CHANGED ON 1/1/2021 - PLEASE REVISE |
| | THE DRAWINGS TO REFLECT THE DESIGN PER THE CODE IN |
| | EFFECT ( 2020 FBC AND ASCE 7-16) |
| | 3) WIND SPEED SHOWN FOR DESIGN SHOULD BE 170MPH PER FBC |
| | WPB AMENDMENTS SECTION 120 FOR RISK CATEGORY II. |
| | 4) PLEASE PROVIDE THE COMPLETE FLORIDA STATE PRODUCT |
| | APPROVAL FOR THE EXTERIOR WINDOW AND DOORS AS LISTED ON |
| | THE DRAWINGS. |
| | 5) PLEASE SHOW THE LOCATIONS FOR THE BUILDING TO |
| | FOUNDATION ANCHORING BASE PLATES. |
| | 6) PLEASE PROVIDE THE DRAWINGS FOR THE EXTERIOR |
| | ALUMINUM ENCLOSURES. |
| | 7) PLEASE SHOW THE SLOPE OF THE DRIVEWAY TO DRAIN |
| | WITHIN THE PROPERTY LINES. |
| | 8) WINDOW FRAMING SHOWN - THE WIDTH OF THE FRAMING OR |
| | BUCK NEED TO BE AS WIDE AS THE WINDOW FRAME FBC |
| | R609.7.2.1 UNLESS OTHERWISE TESTED, BUCKS SHALL EXTEND |
| | BEYOND THE INTERIOR FACE OF THE WINDOW OR DOOR FRAME |
| | SUCH THAT FULL SUPPORT OF THE FRAME IS PROVIDED. |
| | 9) ALUMINUM PORCH ENCLOSURE DETAILS AND WINDOW AND DOOR |
| | PRODUCT APPROVALS MAY BE DEFERRED SUBMITTALS BY LISTING |
| | ITEMS TO BE DEFERRED ON THE CONSTRUCTION DOCUMENTS - |
| | 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| | DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| | IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| | THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| | UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| | APPROVED BY THE BUILDING OFFICIAL. |
| | |