| 2021-02-12 10:42:35 | SFR REMODEL |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) PLEASE PROVIDE COMPLETE PRODUCT APPROVALS AS LISTED |
| | ON THE DRAWINGS FOR THE NEW EXTERIOR WINDOWS AND DOORS. |
| | 2) PLEASE SHOW THE WIDTH OF THE REAR BEDROOM. FBC |
| | R304.2 |
| | 3) PLEASE SHOW THE SPACE DIMENSIONS FOR THE BATHROOM |
| | FIXTURES (SHOWER, TOILET) FBC R307.1 |
| | 4) JOB VALUE SHOWN ON THE BUILDING PERMIT APPLICATION |
| | APPEARS TO BE LOW PLEASE SHOW THE TOTAL JOB COST (ALL |
| | MATERIAL AND LABOR AS IF PRICED BY A CONTRACTOR). FBC |
| | WPB AMENDMENTS ? FOR PERMITTING PURPOSES THE VALUE OF |
| | ALL LABOR AND MATERIALS REQUIRED TO COMPLETE THE |
| | PROJECT ARE REQUIRED TO BE INCLUDED IN THE COST. FBC |
| | 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COST, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL ? SWIFT, MEANS, ETC.) AS PUBLISHED |
| | BY INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | 5) WINDOW AND DOOR PRODUCT APPROVALS MAY BE DEFERRED |
| | SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON THE |
| | CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT |
| | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |