| Date |
Text |
| 2021-01-27 13:55:00 | 01/27/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. PLEASE PROVIDE WHAT TYPE OF OCCUPANCY THIS INTERIOR |
| | BUILD-OUT WILL BE AND THE OCCUPANCY LOAD PER THE WPB |
| | AMENDMENT TO FBC TO 107.3.5.1.1. |
| | |
| | 2. WHERE TOILET ROOMS ARE PROVIDED, EACH TOILET ROOM |
| | SHALL COMPLY WITH 603. WHERE BATHING ROOMS ARE |
| | PROVIDED, EACH BATHING ROOM SHALL COMPLY WITH 603. THE |
| | BATHROOM ON THE SECOND FLOOR HAS TO COMPLY WITH THE |
| | 2020 ACCESSIBILITY CODE; |
| | |
| | A. THE TURNING SPACE COMPLYING WITH 304 SHALL BE |
| | PROVIDED WITHIN THE ROOM PER THE 2020 FBC ACC SECTION |
| | 603.2.1. |
| | |
| | B. DOORS SHALL NOT SWING INTO THE CLEAR FLOOR SPACE OR |
| | CLEARANCE REQUIRED FOR ANY FIXTURE. DOORS SHALL BE |
| | PERMITTED TO SWING INTO THE REQUIRED TURNING SPACE PER |
| | THE 2020 FBC ACC SECTION 60.3.2.3. |
| | |
| | C. A CLEAR FLOOR SPACE COMPLYING WITH 305, POSITIONED |
| | FOR A FORWARD APPROACH, AND KNEE AND TOE CLEARANCE |
| | COMPLYING WITH 306 SHALL BE PROVIDED PER THE 2020 ACC |
| | FBC SECTION 606.2. |
| | |
| | D. SHOWER COMPARTMENTS SHALL HAVE SIZES AND CLEARANCES |
| | COMPLYING WITH 2020 FBC SECTION 608.2. |
| | |
| | E. THE CONTROLS, FAUCETS, AND SHOWER SPRAY UNITS SHALL |
| | COMPLY WITH 309.4. PER THE 2020 FBC ACC SECTION 608.5. |
| | |
| | F. THE GRAB BARS FOR WATER CLOSETS SHALL COMPLY WITH |
| | 609. GRAB BARS SHALL BE PROVIDED ON THE SIDEWALL |
| | CLOSEST TO THE WATER CLOSET AND ON THE REAR WALL. |
| | PLEASE REFER TO EXCEPTION 1 ON REINFORCEMENT PER THE |
| | 2020 FBC SECTION 604.5 (1). |
| | |
| | 3. THIS IS A 2021 PERMIT, AND ON-PAGE P0.1 AND P3.1, IT |
| | REFERS TO THE 2017 CODE. PLEASE CHANGE TO REFER TO THE |
| | CURRENT CODE PER THE WPB AMENDMENTS TO FBC 102.4. |
| | |
| | 4. PLEASE PROVIDE CLEAR FLOOR SPACE FOR ACCESSIBLE |
| | EMPLOYEE BRAKE KITCHEN AND GIVE A CABINET HEIGHT DETAIL |
| | THAT COMPLIES WITH 2020 FBC ACC SEC. 606.3. |
| | |
| | 5. ON SHEET P2.1 ON NOTE 3 FOR THE ICEMAKER AND COFFEE |
| | MAKER, ADD TO THE NOTE THAT THE BACKFLOW DEVICE SHALL |
| | COMPLY WITH THE ASSE 1024 NON-CARBONATED. |
| | |
| | 6. PLEASE SHOW A HAMMER ARRESTOR FOR THE REFRIGERATOR |
| | ICEMAKER TO CONFORM TO ASSE 1010 PER THE 2020 FBC |
| | SECTION 609.4. |
| | |
| | 7. PLEASE SHOW ALL SHUTOFF VALVES ON ISOMETRIC DRAWING |
| | PER THE WPB AMENDMENTS TO FBC 107.2.1. |
| | |
| | 8. PLEASE PROVIDE A SHUTOFF VALVE TO THE RISER TO THE |
| | SECOND-FLOOR BATHROOM WITH ACCESS PER THE 2020 FBC |
| | SECTION P 606.1(4). |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |