| Date |
Text |
| 2021-06-04 15:07:56 | SFR ADDITION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) PROVIDE A SOIL REPORT (GEOTECHNICAL REPORT) FROM A |
| | SOIL ENGINEER FBC R401.4 |
| | 2) YOU HAVE PROVIDED EXTERIOR DOOR INSTALLATION |
| | INSTRUCTIONS - I CANNOT FIND THE FRONT PAGES ON THE |
| | FLORIDA PRODUCT APPROVAL WEB SITE - PLEASE PROVIDE |
| | COMPLETE MIAMI DADE OR FLORIDA STATE PRODUCT APPROVAL |
| | FOR THE EXTERIOR DOOR. |
| | 3) YOU PROVIDED A PRODUCT APPROVAL FOR ROOF SHINGLES - |
| | THE ADDITION THAT YOU ARE BUILDING HAS A LOW SLOPE ROOF |
| | - SHINGLES CANNOT BE APPROVED FOR A LOW SLOPE ROOF. |
| | PLEASE PROVIDE A COMPLETE MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVAL FOR THE FLAT DECK ROOFING = PLEASE |
| | CIRCLE THE ROOFING SYSTEM TO BE USED IN THE PRODUCT |
| | APPROVAL - IF NEEDED PLEASE PROVIDE SIGNED AND SEALED |
| | ADDITIONAL ATTACHMENT DETAILS FROM AN ARCHITECT OR |
| | ENGINEER FOR THE ROOF ZONES 2 AND 3 WHICH MAY REQUIRE A |
| | HIGHER WIND PRESSURE - SEE NOTES ON THE PRODUCT |
| | APPROVAL. |
| | 4) ROOFING SYSTEM AND WINDOW AND DOOR PRODUCT APPROVALS |
| | MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE |
| | DEFERRED ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 |
| | DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| | DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| | THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED |
| | SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| | REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL |
| | WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |
| | |