| 2021-06-22 15:31:35 | SFR ADDITION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) PLEASE SHOW THE EXTERIOR WALL SHEATHING TYPE, |
| | THICKNESS AND ATTACHMENT (NAILING) REQUIREMENTS. FBC |
| | R703.3.1 |
| | 2) PLEASE SHOW FLOOR SHEATHING TYPE, THICKNESS. FBC |
| | R503.1 |
| | 3) PRODUCT APPROVAL PROVIDED FOR THE ROOFING IS FOR AN |
| | INSULATED ROOF DECK (DRAWINGS DO NOT SHOW INSULATION ON |
| | TOP OF THE ROOF SHEATHING) AND IT SHOWS A WIND DESIGN |
| | PRESSURE OF (-60) - WIND ZONE 3 REQUIRES A WIND DESIGN |
| | PRESSURE OF 108.17 - PLEASE PROVIDE ADDITION ATTACHMENT |
| | DETAILS FROM AN ARCHITECT OR ENGINEER PER THE PRODUCT |
| | APPROVAL LIMITATION NOTE NUMBER 7 |
| | |
| | |
| | DEFERRED = ROOFING SYSTEM PRODUCT APPROVALS MAY BE |
| | DEFERRED SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON |
| | THE CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED |
| | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION |
| | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL |
| | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING |
| | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS |
| | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE |
| | BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL |
| | ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A |
| | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |
| | |