| 2021-04-27 09:06:24 | SFR ADDITION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) PLEASE PROVIDE A FLOOR PLAN (COULD BE HAND DRAWN) |
| | SHOWING THE LOCATION OF THE EXISTING OR ADDED SMOKE |
| | DETECTORS PER FBC R314.2.2 ALTERATIONS, REPAIRS AND |
| | ADDITIONS. |
| | WHERE ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A |
| | PERMIT OCCUR, OR WHERE ONE OR MORE SLEEPING ROOMS ARE |
| | ADDED OR CREATED IN EXISTING DWELLINGS, THE INDIVIDUAL |
| | DWELLING UNIT SHALL BE EQUIPPED WITH SMOKE ALARMS |
| | LOCATED AS REQUIRED FOR NEW DWELLINGS. |
| | 2) PLEASE SHOW THE EXTERIOR WALL SHEATHING TYPE, |
| | THICKNESS AND ATTACHMENT REQUIREMENTS. |
| | 3) PLEASE SHOW FLOOR SHEATHING TYPE, THICKNESS AND |
| | ATTACHMENT REQUIREMENTS. |
| | 4) R30 INSULATION WILL NOT ALLOW THE REQUIRED 1 INCH |
| | AIR GAP BETWEEN THE INSULATION AND THE ROOF SHEATHING |
| | FOR VENTILATION. FBC R806.3 |
| | 5) ROOF VENTILATION - EAVE SHOULD SHOW A CONTINOUS |
| | SCREEN VENT TO VENT BETWEEN EACH RAFTER FBC R806.1 |
| | 6) PLEASE CIRCLE THE ROOFING SYSTEM TYPE (SUCH AS |
| | SYSTEM TYPE A1 OR A2 ETC) TO BE USED IN THE PRODUCT |
| | APPROVAL PROVIDED - IF NEEDED PLEASE PROVIDE SIGNED AND |
| | SEALED ADDITIONAL ATTACHMENT DETAILS FROM AN ARCHITECT |
| | OR ENGINEER FOR THE ROOF ZONES 2 AND 3 WHICH MAY |
| | REQUIRE A HIGHER WIND PRESSURE - SEE NOTES ON THE |
| | PRODUCT APPROVAL. |
| | |
| | |
| | DEFERRED = ROOFING SYSTEM PRODUCT APPROVALS MAY BE |
| | DEFERRED SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON |
| | THE CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED |
| | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION |
| | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL |
| | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING |
| | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS |
| | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE |
| | BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL |
| | ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A |
| | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |
| | |