| Date |
Text |
| 2021-05-13 12:22:47 | FOUNDATION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected]. |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) STRUCTURAL DRAWINGS SHOW THE DESIGN PER ASCE 7-10 - |
| | PLEASE REVISE THE DRAWINGS TO SHOW THE DESIGN PER FBC |
| | 2020 AND ASCE 7-16 |
| | 2) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT. |
| | 3) SHOW WHICH BUILDING IS ADDRESS 2113 |
| | 4) PLEASE SHOW THE SEPARATION DISTANCE BETWEEN |
| | BUILDINGS AND FROM PROPERTY LINES FBC 602 |
| | 5) A SEPARATE BUILDING PERMIT WILL BE REQUIRED FOR EACH |
| | BUILDING - SHOWING ADDRESS AND JOB COST FOR EACH. |
| | 6) JOB VALUE SHOWN ON THE BUILDING PERMIT APPLICATION |
| | APPEARS TO BE LOW - PLEASE PROVIDE A COST BREAKDOWN. |
| | 7) WHEN WILL YOU APPLY FOR THE COMPLETE BUILDING |
| | PERMIT? |
| | |
| | FOUNDATION PERMIT WILL ONLY BE ISSUED WITH BUILDING |
| | OFFICIAL APPROVAL - FBC WPB AMENDMENTS 105.13 PHASED |
| | PERMIT APPROVAL. AFTER SUBMITTAL OF THE APPROPRIATE |
| | CONSTRUCTION DOCUMENTS, |
| | THE BUILDING OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT |
| | FOR THE CONSTRUCT ION OF FOUNDATIONS OR ANY OTHER |
| | PART OF A BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION |
| | DOCUMENTS FOR THE WHOLE BUILDING OR STRUCTURE |
| | HAVE BEEN SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE |
| | FOUNDATION OR OTHER PARTS OF A |
| | BUILDING OR STRUCTURE SHALL PROCEED AT THE HOLDER'S OWN |
| | RISK WITH THE BUILDING OPERATION AND |
| | WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE |
| | STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE |
| | REQUIRED TO MEET THE REQUIREMENTS OF THE TECHNICAL |
| | CODES. THIS PROVISION IS ONLY FOR THE |
| | FLORIDA BUILDING CODE. ALL OTHER AGENCY APPROVALS |
| | NECESSARY FOR CONSTRUCTION MUST BE SECURED |
| | PRIOR TO THIS PROVISION BEING APPLIED. |