| Plan Review Notes For Permit 20121352 |
| Permit Number |
20121352 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-01-14 09:27:21 | OFFICE BUILD OUT | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 | | | AMENDMENTS | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) BUILDING CONSTRUCTION TYPE IS SHOWN AS VB - WITH 5 | | | STORIES - PLEASE REEVALUATE THE BUILDING CONSTRUCTION | | | TYPE - SEE FBC 504.4 | | | 2) DRAWING A1.1 - PLEASE SHOW THE DOOR MANEUVERING | | | CLEARANCE FOR RESTROOMS 137 AND 139 FROM THE INSIDE PER | | | FBC ACCESSIBILITY 404.2.4 | | | 3) DRAWING A1.1 - SHOW THE DIMENSIONS OF THE CLEAR | | | FLOOR SPACES AND THE TURNING DIAMETER IN THE ACCESSIBLE | | | TOILET ROOMS. COMPLY WITH FBC-ACCESS. SECS.305.3, | | | 304.3.1. | | | 4) DRAWING A1.3 - RESTROOM ELEVATIONS - SHOW THE HEIGHT | | | OF THE PAPER DISPENSER OUTLET FROM THE FINISHED FLOOR. | | | THE MAXIMUM HEIGHT OF THE OUTLET DISPENSER SHALL COMPLY | | | WITH FBC-ACCESS. SECS.308.2 OR 308..3. | | | | | | | | | | | | |
|