| 2022-03-21 16:28:27 | FAILED |
| | |
| | 1) THE SUBMITTED COMMUNICATION FACILITY PLACEMENT |
| | PERMIT - CITY RIGHTS-OF-WAY MUST BE APPROVED PRIOR TO |
| | THIS PERMIT BEING APPROVED. THE PLANS INCLUDED WITH |
| | THIS ELECTRICAL PERMIT MUST MATCH THE PLANS APPROVED |
| | WITH THE AFOREMENTIONED PERMIT. SOME OF THE COMMENTS |
| | BELOW ARE INCLUDED ON THE PLACEMENT PERMIT REVIEW AS |
| | WELL AS WITH THIS PERMIT. |
| | |
| | 2) UPDATED COMMENT: THE POWER ROUTE PLAN SHEET P-1 |
| | STATES THAT FPL WILL MAKE THE ELECTRICAL WIRE TAP FROM |
| | AN EXISTING POLE TO A PROPOSED HANDHOLE; HOWEVER, SHEET |
| | P-2 STATES THAT IT WILL COME FROM AN EXISTING |
| | TRANSFORMER. IF IT IS NOT FROM THE TRANSFORMER, YOU |
| | MUST SHOW WHICH POLE IS BEING USED SO THAT STAFF CAN |
| | VERIFY IMPACTS. IF YOU ARE USING THE TRANSFORMER, YOU |
| | MUST PROVIDE VERIFICATION THAT THERE IS A UTILITY |
| | EASEMENT THAT ALLOWS POWER SUPPLYING YOUR FACILITY TO |
| | CROSS CITY OWNED PROPERTY. IF THERE IS NO EASEMENT, |
| | POWER TO SUPPLY YOUR FACILITY MAY NOT CROSS CITY OWNED |
| | PROPERTY. THE BEST METHOD IS ON A SURVEY; HOWEVER, |
| | RECORDED DOCUMENTATION THAT CLEARLY IDENTIFIES THIS |
| | LOCATION IS ALSO ACCEPTABLE. NOTE: FPL STATING THEY |
| | HAVE AN EASEMENT, DOES NOT VERIFY THAT THEY HAVE AN |
| | EASEMENT. IF NO EASEMENT IS PRESENT THE UNDERGROUND |
| | ELECTRIC MUST COME FROM AN ALTERNATIVE LOCATION. |
| | |
| | 3) THE HANDHOLE AND BORE PIT NOTES ON SHEET P-1 STATE |
| | THAT THE SIDEWALK WILL BE RESTORED; HOWEVER, SIDEWALK |
| | AND LANDSCAPE AREAS WILL NEED RESTORATION. PLEASE |
| | UPDATE THE NOTATIONS ACCORDINGLY. |
| | |
| | 4) THE EASTERNMOST BORE PIT APPEARS TO CROSS THE |
| | RIGHT-OF-WAY LINE ONTO CITY PROPERTY, WHICH IS NOT |
| | PERMITTED. ALL WORK IS TO REMAIN IN THE RIGHT-OF-WAY |
| | UNLESS THERE IS A UTILITY EASEMENT PRESENT AND SHOWN ON |
| | THE SURVEY. THIS GOES FOR ALL THE INSTALLATIONS THAT |
| | ARE IMMEDIATELY ADJACENT TO THE RIGHT-OF-WAY LINE. |
| | |
| | 5) REPEAT COMMENT: THE PLANS SHOW THE GAS LINE WITHIN |
| | 2-FEET OF THE CAISSON AND THROUGH THE MAJORITY OF YOUR |
| | BORE PITS. IN ORDER TO VERIFY THAT THE INSTALLATION |
| | WILL NOT INTERFERE WITH THE EXISTING FACILITIES, |
| | PROVIDE A PUBLIC UTILITY LETTER OF NO OBJECTION FROM |
| | FPU REGARDING THE INSTALLATION. |
| | |
| | 6) THIS POLE LOCATION IS APPROVED BY SPECIAL EVENTS. |
| | |
| | 7) THE POLE STYLE AND HEIGHT MEET CITY REQUIREMENTS. |
| | THE POLE COLOR AT THIS LOCATION SHALL BE RAL/RAYCAP |
| | 7022 UMBRA GREY. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446 |