| Date |
Text |
| 2022-01-04 18:11:21 | FAILED |
| | |
| | 1) THE SUBMITTED COMMUNICATION FACILITY PLACEMENT |
| | PERMIT - CITY RIGHTS-OF-WAY MUST BE APPROVED PRIOR TO |
| | THIS PERMIT BEING APPROVED. THE PLANS INCLUDED WITH |
| | THIS ELECTRICAL PERMIT MUST MATCH THE PLANS APPROVED |
| | WITH THE AFOREMENTIONED PERMIT. SOME OF THE COMMENTS |
| | BELOW ARE INCLUDED ON THE PLACEMENT PERMIT REVIEW AS |
| | WELL AS WITH THIS PERMIT. |
| | |
| | 2) THE POLE STYLE AND HEIGHT MEET CITY REQUIREMENTS. |
| | THE POLE COLOR IS TO MATCH THE EXISTING DECORATIVE CITY |
| | LIGHT POLES (SPECKLED BLACK) LOCATED ALONG FERN STREET. |
| | |
| | 3) THIS POLE LOCATION IS APPROVED BY SPECIAL EVENTS. |
| | |
| | 4) THE PLANS SHOW THE GAS LINE WITHIN 2-FEET OF THE |
| | CAISSON AND THROUGH THE MAJORITY OF YOUR BORE PITS. IN |
| | ORDER TO VERIFY THAT THE INSTALLATION WILL NOT |
| | INTERFERE WITH THE EXISTING FACILITIES, PROVIDE A |
| | PUBLIC UTILITY LETTER OF NO OBJECTION FROM FPU |
| | REGARDING THE INSTALLATION. |
| | |
| | 5) THANK YOU FOR PROVIDING THE UTILITY POWER PLAN, |
| | INCLUDING A PARTIAL SURVEY; HOWEVER, THE SURVEY NEEDS |
| | TO SHOW THE FULL LENGTH OF THE UNDERGROUND POWER RUN SO |
| | THAT STAFF CAN VERIFY THAT THE UNDERGROUND ELECTRIC IS |
| | FULLY WITHIN THE RIGHT-OF-WAY. |
| | |
| | 6) THE SUBMITTED PLANS SHOW THE UNDERGROUND ELECTRIC |
| | BEING SUPPLIED FROM AN FPL TRANSFORMER THAT IS LOCATED |
| | ON CITY PROPERTY ON THE EAST SIDE OF EVERNIA STREET. |
| | THE SURVEY NEEDS TO SHOW THAT THE AREA WHERE YOU PLAN |
| | TO PULL POWER FROM ACROSS CITY PROPERTY IS LOCATED |
| | WITHIN A UTILITY EASEMENT. IF NO EASEMENT IS PRESENT, |
| | YOU WILL NEED TO GET THE POWER FROM AN ALTERNATIVE |
| | LOCATION. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| | [email protected] |
| | |
| | |