| 2021-01-20 13:34:16 | SFR ADDITION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected]. |
| | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) DRAWINGS SHOW THAT DESIGN PER 2017 FBC - PLEASE |
| | REVISE THE CODE USED FOR DESIGN TO BE 2020 FBC. |
| | 2) JOB VALUE SHOWN ON THE BUILDING PERMIT APPLICATION |
| | APPEARS TO BE LOW - PLEASE PROVIDE A SIGNED CONTRACT TO |
| | VERIFY THE JOB VALUE SHOWN - 109.3 BUILDING PERMIT |
| | VALUATIONS. IF, IN THE OPINION OF THE BUILDING |
| | OFFICIAL, THE CLAIMED VALUATION |
| | OF BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW |
| | DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| | CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| | APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| | BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| | LATEST PUBLISHED DATA OF NATIONAL |
| | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, |
| | MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL |
| | CODE CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE |
| | SET BY THE BUILDING OFFICIAL. |
| | 3) PLEASE SHOW THE ROOF SHEATHING ATTACHMENT DETAILS. |
| | 4) PLEASE SHOW THE WALL SHEATHING ATTACHMENT DETAILS. |
| | 5) PLEASE SHOW THE FLOOR JOIST ON CENTER SPACING. |
| | 6) PLEASE SHOW THE FLOOR SHEATHING ATTACHMENT DETAILS. |
| | 7) PLEASE SHOW THE ATTIC VENTILATION TO COMPLY WITH FBC |
| | R806.1 |
| | 8) DRAWING A1.0 SHOWS UTILITY ROOM "MODIFY FOUNDATION" |
| | IS THERE A NEW FOUNDATION FOR THE NEW EXTERIOR WALLS |
| | FOR THE UTILITY ROOM - PLEASE SHOW FOUNDATION DETAILS. |
| | 9) PLEASE SHOW THE LOCATIONS OF THE REQUIRED SMOKE |
| | ALARMS THROUGHOUT THE EXISTING HOUSE TO COMPLY WITH FBC |
| | R314.2.2 ALTERATIONS, REPAIRS AND ADDITIONS. |
| | WHERE ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A |
| | PERMIT OCCUR, OR WHERE ONE OR MORE SLEEPING ROOMS ARE |
| | ADDED OR CREATED IN EXISTING DWELLINGS, THE INDIVIDUAL |
| | DWELLING UNIT SHALL BE EQUIPPED WITH SMOKE ALARMS |
| | LOCATED AS REQUIRED FOR NEW DWELLINGS. |
| | 10) PLEASE PROVIDE THE FRONT PAGES OF THE FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE FIXED GLASS AND THE SINGLE |
| | HUNG WINDOWS (INSTALLATION INSTRUCTIONS HAVE BEEN |
| | PROVIDED). |
| | 11) ROOFING SYSTEM TO BE USED ON THE PROVIDED PRODUCT |
| | APPROVAL REQUIRES ADDITIONAL SIGNED AND SEALED |
| | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR |
| | ROOF WIND ZONES 2 AND 3 WHICH REQUIRE A HIGHER PRESSURE |
| | THAN THE MAXIMUM SHOWN ON THE PRODUCT APPROVAL (-60) - |
| | SEE NOTE NUMBER 9 ON THE PRODUCT APPROVAL. |
| | 12) ROOFING AND WINDOW AND DOOR PRODUCT APPROVALS MAY |
| | BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE DEFERRED |
| | ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED |
| | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED |
| | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN |
| | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION |
| | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL |
| | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL |
| | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING |
| | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS |
| | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE |
| | BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL |
| | ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A |
| | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |