| Date |
Text |
| 2021-04-07 13:37:32 | 2ND REVIEW FBC-2017 PLUMBING |
| | PERMIT- 20121129 |
| | 4/7/21 |
| | |
| | CODES IN EFFECT: |
| | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017 |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | COMMENTS FROM THE 1ST REVIEW LISTED BELOW STILL EXIST. |
| | NO REVISED PLANS OR NARRATIVE RESPONSES WERE PROVIDED. |
| | |
| | 1) P0.1: PROVIDE PLUMBING FIXTURE CALCULATIONS IN |
| | COMPLIANCE WITH TABLE 403.3 FBC P. PROVIDE A SCHEDULE |
| | THAT INDICATES THE REQUIRED AND PROVIDED NUMBER OF |
| | REQUIRED FIXTURES. PLEASE NOTE THAT A SERVICE SINK IS A |
| | REQUIRED FOR MERCANTILE AND STORAGE OCCUPANCIES. REVISE |
| | THE PLANS ACCORDINGLY. |
| | |
| | 2) SHEETS P0.1, P2.1 & P5.1: A GREASE INTERCEPTOR IS |
| | REQUIRED IN ACCORDANCE WITH 1003.3.1 FBC P TO RECEIVE |
| | THE DRAINAGE FROM THE 3-COMPARTMENT SINK (SK-3) AND THE |
| | SK SINKS. THE LARGE SK SINK APPEARS TO BE FOR FOOD PREP |
| | OR POT OR DISHWASHING WHICH REQUIRES AN INDIRECT WASTE |
| | PIPE. |
| | |
| | 1003.3.1 GREASE INTERCEPTORS AND AUTOMATIC GREASE |
| | REMOVAL DEVICES REQUIRED. |
| | A GREASE INTERCEPTOR OR AUTOMATIC GREASE REMOVAL DEVICE |
| | SHALL BE REQUIRED TO RECEIVE THE DRAINAGE FROM FIXTURES |
| | AND EQUIPMENT WITH GREASE-LADEN WASTE LOCATED IN FOOD |
| | PREPARATION AREAS, SUCH AS IN RESTAURANTS, HOTEL |
| | KITCHENS, HOSPITALS, SCHOOL KITCHENS, BARS, FACTORY |
| | CAFETERIAS AND CLUBS. FIXTURES AND EQUIPMENT SHALL |
| | INCLUDE POT SINKS, PRERINSE SINKS; SOUP KETTLES OR |
| | SIMILAR DEVICES; WOK STATIONS; FLOOR DRAINS OR SINKS |
| | INTO WHICH KETTLES ARE DRAINED; AUTOMATIC HOOD WASH |
| | UNITS AND DISHWASHERS WITHOUT PRERINSE SINKS. GREASE |
| | INTERCEPTORS AND AUTOMATIC GREASE REMOVAL DEVICES SHALL |
| | RECEIVE WASTE ONLY FROM FIXTURES AND EQUIPMENT THAT |
| | ALLOW FATS, OILS OR GREASE TO BE DISCHARGED. WHERE LACK |
| | OF SPACE OR OTHER CONSTRAINTS PREVENT THE INSTALLATION |
| | OR REPLACEMENT OF A GREASE INTERCEPTOR, ONE OR MORE |
| | GREASE INTERCEPTORS SHALL |
| | BE PERMITTED TO BE INSTALLED ON OR ABOVE THE FLOOR AND |
| | UPSTREAM OF AN EXISTING GREASE INTERCEPTOR. |
| | |
| | 3) P0.1, P2.1 & P5.1: THE PLANS DO NOT MAKE CLEAR THE |
| | NEED FOR THE LARGE TRENCH DRAINS AND WHAT DRAINAGE THEY |
| | WILL RECEIVE. PLEASE NOTE THE REQUIREMENT IN COMMENT #1 |
| | FOR THAT DRAINAGE TO BE DISCHARGED INTO A GREASE |
| | INTERCEPTOR AND PLEASE CLARIFY- SECTION 1003.3.1 AND |
| | SECTION 107.2.1 WPB. |
| | |
| | 4) P0.1: REFER TO SECTION 802.1 AND PROVIDE AN INDIRECT |
| | WASTE DETAIL FOR SK-3 AND THE LARGE SK SINK. |
| | |
| | 5) P0.1, P2.1 & P5.1: THE TRENCH DRAIN FIXTURE |
| | SPECIFICATIONS INDICATE THE DRAINS ARE FOR CORROSIVE OR |
| | ACID WASTE APPLICATIONS. PLEASE CLARIFY WHAT DRAINAGE |
| | THEY WILL RECEIVE AND NOTE SECTION 803.1 REQUIRES |
| | CORROSIVE LIQUIDS, SPENT ACIDS, OR OTHER HARMFUL |
| | CHEMICALS TO BE NEUTRALIZED OR DILUTED BY A DEVICE |
| | BEFORE DISCHARGING INTO THE PLUMBING SYSTEM. |
| | |
| | 6) P2.1 & P5.1: INDICATE HOW TRAP SEALS WILL BE |
| | PROVIDED FOR THE TRENCH DRAINS- SECTIONS 901.2 & |
| | 1002.4.1 FBC P. |
| | |
| | 7) P2.1 & P5.1: INDICATE HOW THE TWO LARGE TRENCH |
| | DRAINS AND FLOOR SINK FOR THE 3-COMPARRTMENT SINK ARE |
| | BEING VENTED- SECTION 901.2.1 FBC P. |
| | |
| | 8) A1.1.1, P2.1 & P5.1: THE FLOOR PLAN SHOWS AN ICE |
| | MACHINE WITH NO WASTE RECEPTOR TO RECEIVE THE DRAINAGE |
| | FROM THE ICE AND THE CONDENSATION. PLEASE INDICATE HOW |
| | THE DRAINAGE WILL BE DISCHARGED TO AN APPROVED |
| | LOCATION- SECTION 314.2 FBC P. |
| | |
| | 9) P0.1: PROVIDE A WATER HEATER EQUIPMENT SCHEDULE ON |
| | THE PLAN AND SUBMIT MANUFACTURER'S SPECIFICATIONS- |
| | SECTION G2448.1 FBC FG AND TABLE C404.2 FBC EC. |
| | |
| | 10) PROVIDE A PLUMBING SUB-PERMIT APPLICATION- SECTION |
| | 105.1 WPB. |
| | |
| | NEW COMMENT. |
| | |
| | 1) PLEASE SHOW THE LOCATION OF THE REQUIRED SINK ON THE |
| | PLANS AND ISOMETRIC DRAWINGS, AND ADD THE SINK TO THE |
| | FIXTURE SCHEDULE- TABLE 403.1 FBC P. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |