| 2021-01-08 08:13:48 | 01/08/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. PLEASE PROVIDE THE MANUFACTURE'S SPECIFICATIONS FOR |
| | THE PUMP. PLEASE IDENTIFY ON THE PUMP CURVE WHICH CURVE |
| | KEY IS SPECIFIC TO THE PUMP BEING INSTALLED ON THIS |
| | POOL. THIS IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW |
| | FROM THE TDH CALCULATIONS PER THE ANSI/APSP/ICC 7 - |
| | 2013 SECS. 4.4.9, 4.4.9.1. |
| | |
| | 2. SOLAR COVER REQUIRED PER 2017 FBC RE 403.10.3 |
| | LIQUID. |
| | |
| | 3. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN |
| | DRAIN GAS HEATER AND THE FILTER PER THE WPB AMENDMENTS |
| | TO FBC SEC. 107.2.1. |
| | |
| | 4. SUBMIT DOCUMENTATION THAT THE GAS POOL HEATER MEETS |
| | THE MINIMUM REQUIRED EFFICIENCY AS REQUIRED BY THE 2017 |
| | FBC-ENERGY SEC.R403.10.4. |
| | |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |