| 2021-08-16 08:53:29 | PROVISOS: |
| | 1. LIGHTING POLES ALONG ROSEMAY AVENUE SHALL MATCH THE |
| | DOUBLE HEAD POLES BEING INSTALLED BY THE CITY ON EAST |
| | SIDE OF ROSEMARY, AND THE POLES AND FIXTURES ALONG 2ND |
| | AND 3RD SHALL MATCH THE DMP CITY STANDARD (MANUFACTURER |
| | AND DESIGN). SPECS BEING PROVIDED TO APPLICANT. ALL |
| | POLES ARE PURCHASE AND INSTALLATION ARE THE |
| | RESPONSIBILITY OF THE DEVELOPER. |
| | 2. PHOTOMETRICS ALONG ROSEMARY SHALL BE COMPLETED TO |
| | ENSURE COMPLIANCE WITH MIN 06 FOOTCANDLE AT ONE FOOT |
| | ABOVE THE SIDEWALK AT THE CURB SIDE. |
| | 3. SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS THE |
| | TWO PARKING GARAGE ENTRANCES. |
| | 4.PLEASE DISCUSS WITH ENG. DEPARTMENT THE POSSIBILITY |
| | TO REGRADE ON-STREET PARKING TO DRAIN TOWARDS THE |
| | CENTER OR ROAD, AND RELOCATE THE GUTTER BETWEEN |
| | ON-STREET PARKING AND ROAD. THE GOAL IS TO ALLOW THE |
| | BULB OUTS AS A CONTINUOUS CURB. |
| | 5. A MECHANICAL EQUIPMENT SCREENING PLAN SHALL BE |
| | SUBMITTED FOR APPROVAL BY THE ZONIND DIVISION BEFORE |
| | CONSTRUCTION STARTS. PARAPET WALL SHALLBE AS TALL AS |
| | ANY ROOF TOP MECHANICAL EQUIPMENT. EQUIPMENT SHALL BE |
| | GROUP TO MINIMIZE THE AREA WHERE EQUIPMENT IS LOCATED |
| | AND SCREEN SHALL BE PROVIDED AROUND THE EQUIPMENT AT |
| | THE MINIMUM CLEARANCE REQUIRED BY MANUFACTURER. |
| | 6. PROJECT NEED TO TRANSFER 1,359 SF OF ADDITIONAL TDRS |
| | TO THE SITE TO ACHIEVE THE FINAL GROSS BUILDING AREA. |