| 2021-05-13 13:46:46 | 1) SHT. C2.4 - PLACE A NOTE ON THE PLAN THAT SEPARATE |
| | PERMITS ARE REQUIRED FOR THE IRRIGATION, DOMESTIC WATER |
| | AND THE THE FIRE LINE BACKFLOWS PER THE CITY OF WEST |
| | PALM BEACH CROSS-CONNECTION CONTROL MANUAL. 2ND |
| | REQUEST. |
| | 2) THE PLUMBING FIXTURE COUNT LISTED ON SHT. A-5.9 IS |
| | VAGUE. WHAT OCCUPANCY ARE YOU BASING THESE FIXTURE |
| | REQUIREMENTS ON? THE FIXTURE REQUIREMENTS SHALL BE |
| | EVALUATED FOR EACH SEPARATE OCCUPANCY BASED ON THE |
| | OCCUPANT LOAD AND THEN SUMMED AND ROUNDED UP TO THE |
| | NEXT WHOLE NUMBER. FBC-PLUMBING SEC. 403.1.1. THERE ARE |
| | NO DRINKING FOUNTAINS LISTED IN THE FIXTURE |
| | CALCULATIONS AND THEY WILL BE REQUIRED BASED ON THE |
| | OCCUPANCIES. |
| | 3) SHT. LS-0.0 - SUBMIT A FIRE STOPPING PENETRATION |
| | DETAIL FOR PVC PIPE LARGER THAN 2 INCHES IN DIAMETER. |
| | WPB AMEND. TO FBC SEC. 107.2.1. |
| | 4) SHT. A-5.3 - DETAIL "A" - POOL PAVILION RESTROOMS - |
| | THE HANDICAP ACCESSIBLE WATER CLOSETS ARE STILL SHOWN |
| | AS BEING 1 FOOT 8 INCHES FROM THE ADJACENT WALL TO THE |
| | CENTERLINE OF THE WATER CLOSETS.COMPLY WITH ANSI |
| | A117.1-1986 SEC.4.16. 2ND REQUEST. |
| | 5) SHTS. A-2.1, A-5.2, & A-5.9 - THE DOOR IN ONE OF THE |
| | WOMEN'S ACCESSIBLE TOILET ROOMS IN RESTROOM #A-0126 |
| | CANNOT SWING INTO THE CLEAR FLOOR SPACE REQUIRED FOR |
| | THE WATER CLOSET. COMPLY WITH ANSI A117.1 SEC.4.22.2. |
| | 6) SUBMIT A WATER AND SANITARY RISER FOR THE DOG WASH |
| | BASIN. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 7) SHT. A-5.3 - THE LAVATORY APPEARS TO BE ENCROACHING |
| | INTO THE CLEAR FLOOR SPACE FOR THE WATER CLOSET. |
| | CLEARLY DEFINE THE CLEAR FLOOR SPACE FOR THE WATER |
| | CLOSET. COMPLY WITH ANSI A117.1-1986 SEC.4.16. |
| | 8) SHT A-5.3 - FIXTURE MOUNTING HEIGHTS - THERE ARE |
| | THREE DIFFERENT DIMENSIONS SHOWN TO THE BOTTOM OF THE |
| | LAVATORY. CLARIFY. |
| | 9) SHT. A-5.5 - CLARIFY THE WALL SUBSTRATE AND FINISH |
| | AROUND THE MOP SINK. THE WALL FINISH SHALL COMPLY WITH |
| | FBC-BUILDING SEC. 1210.2.2. DRYWALL WITH EPOXY PAINT |
| | DOES NOT COMPLY.THERE IS NO NOTE ON SHT. A-5.7 AS |
| | STATED IN THE RESPONSE NARRATIVE. CLARIFY. 2ND |
| | REQQUEST. |
| | 10) SHT. A-5.7 - THERE IS A NOTE ON THE LOWER RIGHT |
| | CORNER OF THE PLANS THAT REFERS TO I.D. CONSTRUCTION |
| | DOCUMENTS FOR ALL FINISHES. THERE ARE NO SUCH PLANS IN |
| | THIS SUBMITTAL. CLARIFY. 2ND REQUEST. THIS NOTE APPEARS |
| | IN MULTIPLE PLACES ON PLUMBING FIXTURE ELEVATION |
| | DETAILS. |
| | 11) SHT. A-5.7 - DETAILS #1 & #2 - THERE IS NO GRAB BAR |
| | SHOWN ON THE SIDE WALL ADJACENT TO THE WATER CLOSET. |
| | COMPLY WITH ANSI A117.1-1986 SEC.4.16.4.2ND REQUEST. |
| | 12) SHT. A-5.9 - DETAIL #3 - THE MAXIMUM HEIGHT OF THE |
| | URINAL SHALL BE 17 INCHES PER ANSI A 117.1-1986 SEC. |
| | 4.18.2. |
| | 13) SHT. A-5.9 - DETAIL "B" - TOILET ROOMS #A-0125 & |
| | A-0126 - THE LENGTH OF THE CLEAR FLOOR SPACE FOR THE |
| | WATER CLOSETS SHALL BE A MINIMUM OF 56 INCHES AND THE |
| | PLAN SHOWS 54 INCHES. REVISE THE HATCHED AREAS SHOWING |
| | THE CLEAR FLOOR SPACES. ANSI A117.1 SEC.4.16.2. CHECK |
| | THE LENGTHS OF THE CLEAR FLOOR SPACES FOR THE WATER |
| | CLOSETS IN ALL COMMON AREA TOILET AREAS FOR COMPLIANCE. |
| | 14) SHT. A-5.10 - FIXTURE MOUNTING HEIGHTS - THERE IS |
| | NOTE UNDER THIS HEADING THAT STATES " REFER TO SHT. |
| | A-10.1 FOR ADDITIONAL INFORMATION." SHT. A-10.1 IS |
| | ENLARGED DWELLING UNIT FLOOR PLANS. CLARIFY. |
| | 15) SHT. A-10.1 - SHOW THE DEPTH OF THE LAVATORIES |
| | ADJACENT TO THE WATER CLOSETS IN THE ADAPTABLE |
| | BATHROOMS. THE LAVATORIES SHALL HAVE A MAXIMUM DEPTH OF |
| | 24 INCHES PER THE FAIR HOUSING ACT DESIGN MANUAL PAGE |
| | 7.43. 2ND REQUEST. |
| | 16) SHT. A- 10.2 - SHOW THE LENGTH OF THE SHOWER WALL |
| | ADJACENT TO THE WATER CLOSET IN THE B1 UNIT, TYPE "A" |
| | BATH. THE WALL LENGTH SHALL NOT EXCEED 24 INCHES. FHA |
| | DESIGN MANUAL PAGE 7.44. |
| | 17) SHT. A-10.2 - UNIT B3 - THE DOOR TO THE LAUNDRY |
| | ROOM SHALL PROVIDE A 32 INCH CLEAR OPENING AS IT IS |
| | INTENDED FOR USER PASSAGE. FHA DESIGN MANUAL PAGE 7.19. |
| | 2ND REQUEST. |
| | 18) SINCE THE TOWNHOUSES DO NOT HAVE TO COMPLY WITH THE |
| | REQUIREMENTS OF THE FAIR HOUSING ACT, WHY ARE ALL THE |
| | CLEAR FLOOR SPACES SHOWN ON THESE PLANS? ACCESSIBILITY |
| | REQUIREMENTS FOR TOWNHOUSES ARE IN THE |
| | FBC-ACCESSIBILITY SEC. 233.3.6 AND FL. STATUTE 553.504 |
| | (2). |
| | 19) SHT. A-10.4 - SUBMIT A GRAB BAR REINFORCEMENT |
| | DETAIL FOR THE ADAPTABLE SHOWERS. COMPLY WITH FHA |
| | DESIGN MANUAL PAGE 7.56. 2ND REQUEST. |
| | 20) SUBMIT A WATER RISER DIAGRAM FOR THE MAIN WATER |
| | PIPING FROM THE STREET INTO THE BUILDING AND INCLUDE |
| | THE WATER SYSTEM MAINS AND BRANCH LINES ON THE SYSTEM. |
| | INCLUDE ALL BRANCHES TO HOSE BIBBS, FUTURE CONNECTIONS |
| | AND THE INLET AND OUTLET PIPING FOR THE BOOSTER PUMP. |
| | 21) SHT. P-2.1A & P-2.1B - KEYNOTE #4 CALLS OUT "4 INCH |
| | STORM PIPE DOWN" BUT THE KEYNOTE ON THE PLAN POINTS TO |
| | A WATER LINE. CLARIFY. |
| | 22) SHT. P-2.1A - PROVIDE A MATCH LINE AT THE TOP OF |
| | THE SHEET TO SHOW THE CONTINUATION OF THE 1 INCH WATER |
| | LINE.WPB AMEND. TO FBC SEC. 107.2.1. |
| | 23) SHT. P-2.1B - FOOTNOTES #2 & #3 REFER TO SANITARY |
| | PIPING BUT THE KEYNOTES ARE ON THE WATER SYSTEM. |
| | CLARIFY. |
| | 24) THE WATER SUPPLY VALVES FOR THE FOR THE STACKED |
| | WASHER/DRYER UNITS SHALL BE PROVIDED WITH ACCES PER |
| | FBC-PLUMBING SEC. 606.3. IF THE VALVES ARE LOCATED |
| | BEHIND THE WASHER/DRYER UNITS THEY WILL NOT BE |
| | ACCESSIBLE UNLESS THERE IS A REMOVABLE ACESS PANEL ON |
| | THE UNIT. IF THE VALVES ARE LOCATED ON THE WALL |
| | ADJACENT TO THE UNITS, THEY MAY ALSO NOT BE ACCESSIBLE |
| | BECAUSE OF THE SIZE OF THE UNITS. CLEARLY SHOW THE |
| | LOCATION OF THE VALVES AND THE REQUIRED ACCESS. 2ND |
| | REQUEST. |
| | 25) SHT. P-2.0A - RISER 1S IS NOT TAGGED ON THE RISER |
| | ON SHT. P-6.3. (SEE UNIT A1). |
| | 26) SHT. P-2.0A SHOWS A 3 INCH SANITARY LINE TO THE |
| | SINK AT GRILLE AREA BUT THIS LINE IS NOT SHOWN ON THE |
| | RISER DIAGRAM ON SHT. P-6.3. CLARIFY. |
| | 27) SHT.P-2.0A - RISER 5S IN UNIT A3 BY THE MATCHLINE |
| | IS LABELED AS RISER 6S ON SHT. P6.3. CLARIFY. |
| | 28) SHT. P-2.0B - UNIT B1 MOD- THE SANITARY RISER IN |
| | THE BATHROOM IS LABELED AS 6S BUT LABELED AS 5S ON SHT. |
| | P-6.3. CLARIFY. |
| | 29) SHT. P-2.0B - FIXTURE OI-1- IS THIS UNIT SUPPOSED |
| | TO BE AN "OIL INTERCEPTOR" OR A "GREASE INTERCEPTOR". |
| | IT IS CALLED OUT AS AN OIL INTERCEPTOR ON SHT. P-0.1 |
| | BUT A SCHIER GB-50 IS A GREASE INTERCEPTOR. CLARIFY. |
| | OIL INTERCEPTORS SHALL COMPLY WITH FBC-PLUMBING |
| | SEC.1003.4.2. |
| | 30) SHT. P-2.0B - KEYNOTE #4 CALLS OUT A 2 INCH DRY |
| | VENT BUT THE PLAN SHOWS A 3 INCH SANITARY LINE WITH 35 |
| | DFU'S. SHT. P-6.03 ALSO SHOWS A 3 INCH SANITARY |
| | LINE.CLARIFY. |
| | 31) SUBMIT DETAILS OF THE PRECAST GREASE |
| | INTERCEPTORS.THE CONCRETE GREASE INTERCEPTORS SHALL |
| | COMPLY WITH CITY STANDARD DRAWING GS-7. CONTACT THE |
| | CITY OF WPB ENGINEERING DEPT. AT 561-835-7423 FOR A |
| | COPY OF THE DRAWING. WPB AMEND. TO FBC SEC. 107.2.1.A |
| | SAMPLING PORT IS REQUIRED ON THE OUTLET OF EACH GREASE |
| | INTERCEPTOR AND THE OIL INTERCEPTOR. |
| | 32) SUBMIT SIZING CALCULATIONS FOR THE GREASE |
| | INTERCEPTORS AND OIL INTERCEPTOR PER FBC-PLUMBING |
| | SEC.1003.2. |
| | 33 SHT. P-4.1- UNIT A3 - KEYNOTE #9 CALLS OUT AN AIR |
| | ADMITTANCE VALVE BUT THE AAV IS NOT SHOWN ON THE RISER |
| | 1S. THE RESPONSE NARRATIVE FOR PREVIOUS COMMENT #71 |
| | REFERS TO THE REQUIRED RELIEF VENT BUT THERE IS NO |
| | RELIEF VENT ON RISER 1S.CLARIFY. COMPLY WITH |
| | FBC-PLUMBING SEC.918. |
| | 34) SHT. P-4.2 - UNIT B1-MOD SHOWS THE AIR ADMITTANCE |
| | VALVE LOCATED IN THE WALL NEXT TO THE WATER CLOSET. |
| | CLARIFY. |
| | 35) SHT. P-6.0 - CLARIFY THE PIPE SIZES ON THE WATER |
| | RISER.THE PIPE SIZES ARE EXTREMELY DIFFICULT TO READ. |
| | 36) P-6.0 - THE URINAL IN THE MEN'S RESTROOM CANNOT |
| | DISCHARGE INTO THE HORIZONTAL WET VENT PER FBC-PLUMBING |
| | SEC.912.1.THE URINAL SHALL CONNECT TO THE HORIZONTAL |
| | DRAIN DOWNSTREAM OF THE FLOOR DRAIN. |
| | 37) INDICATE ON THE TRASH CHUTE DETAILS (SHT. A-8.5) IF |
| | THE TRASH CHUTE WILL BE EQUIPPED WITH A FLUSHING RING |
| | AT THE TOP OF THE CHUTE. IF SO, SUBMIT A DETAIL FOR THE |
| | WATER CONNECTION. IF A CHEMICAL SOLUTION WILL BE |
| | CONNECTED TO THE SYSTEM, A BACKFLOW DEVICE SHALL BE |
| | REQUIRED ON THE WATER CONNECTION. |
| | 38) SHT. P-6.2 - THE TOP OF RISER AND THE VENT APPEAR |
| | TO BE CUT OFF. CLARIFY. |
| | 39) SHT. P-6.3 - SECTIONS OF THE SANITARY RISER ARE |
| | MISSING ON THE LEFT SIDE OF THE DRAWING. |
| | 40) SHT.P-8.1 - SUB-METER SPECIFICATIONS - THE ENTIRE |
| | METER HOUSING AND LID SHALL BE CONSTRUCTED OF BRASS IN |
| | ORDER TO BE LOCATED INSIDE THE RETURN AIR CLOSETS. THE |
| | SUBMETERS SHALL COMPLY WITH THE FBC-MECH. SECS. 602.2.1 |
| | & 602.2.1.7. |
| | 41) A SEPARATE PERMIT IS REQUIRED FOR THE GREASE |
| | INTERCEPTORS AND THE OIL INTERCEPTOR. |
| | 42) A SAMPLING PORT IS REQUIRED ON THE OUTLET OF EACH |
| | GREASE INTERCEPTOR AND THE OIL INTERCEPTOR. |
| | 43) SHTS. P-2.0B & P-2.0C - THE KEYNOTES LISTED THAT |
| | REFER TO THE PLUMBING SYSTEM ARE NOT SHOWN ON THE |
| | PLANS. CLARIFY. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |