| Plan Review Notes For Permit 20120712 |
| Permit Number |
20120712 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-05-15 04:24:57 | 1) SHT. P-2.0A - PROVIDE A MATCHLINE AT THE TOP OF PLAN | | | FOR THE CONTINUATION OF THE GAS LIINE. WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | 2) SHT. P-2.0A SHOWS THE GAS LINE AS 3/4 INCH AND SHT. | | | P-2.0B SHOWS THE GAS LIINE AS 1 INCH. CLARIFY. | | | 3) THE LAYOUT OF THE GAS LINE BETWEEN SHEETS P-2.0A & | | | P-2.0B DO NOT CORRELATE WITH EACH OTHER. CLARIFY. | | | 4) SHT. P-2.0B - KEYNOTE #10 - LIST THE SPECIFIC CIVIL | | | DRAWING FOR THE CONTINUATION OF THE GAS LINE. I COULD | | | NOT FIND THE GAS LINE ON THE CIVIL DRAWINGS. | | | 5) SHT. P-6.9 - INDICATE ON THE PLAN WHICH SIZING TABLE | | | FROM THE GAS CODE IS BEING UTILIZED FOR THE LOW | | | PRESSURE SYSTEM. SHOW THE TYPE OF PIPING ON THE PLAN. | | | 6) THE INSTALLATION OF THE PRESSURE REGULATORS SHALL | | | COMPLY WITH FBC-FUEL GAS SEC. 410.2 (1-7). | | | 7) A SEPARATE PERMIT WILL BE REQUIRED FOR THE GAS | | | SYSTEM. | | | 8) SUBMIT COPIES OF THE MANUFACTURER'S SPECIFICATION | | | SHEETS / INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO | | | VERIFY COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | | FBC- FUEL GAS CODE SEC. 402.2, AND 301.3. GAS | | | APPLIANCES SHALL BE LISTED AND LABELED. THE | | | INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT | | | SHALL BE ONSITE AT THE TIME OF INSPECTION. FBC-FUEL GAS | | | CODE SEC.305.1. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | |
|