| 2022-12-22 11:15:49 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | |
| | DENIED - * NOTE: THE BEACH CLUB WAS PREVIOUSLY REVIEWED |
| | UNDER PERMIT #18100526. SOME OF THE CONSTRUCTION |
| | DOCUMENTS ARE WITH PERMIT #18100526. |
| | |
| | 1) WILL COMPLY. PROPERTY TO BE REPLATTED PRIOR TO |
| | ISSUANCE OF THE FIRST C.O. PER SECTION 6(2)(E)(II) OF |
| | RESOLUTION NO. 185-18 (THE "DEVELOPMENT ORDER"). |
| | |
| | 2) NOT RESOLVED. YOU HAVE INDICATED THAT YOU WISH TO |
| | DRY FLOOD PROOF THE BEACH CLUB, PLEASE SUBMIT THE |
| | FOLLOWING ITEMS. FBC 1612 |
| | |
| | [CORRECTIONS REQUIRED TO PRECONSTRUCTION ELEVATION |
| | CERTIFICATE. SEE NFIP REVIEW.] A) A NEW |
| | PRE-CONSTRUCTION ELEVATION CERTIFICATE FOR THE DRY |
| | FLOOD PROOFING. |
| | |
| | COMPLIED. B) PROVIDE A DRY FLOOD PROOFING PLAN THAT |
| | INCLUDES WHERE THE PANELS ARE TO BE STORED AND WHO WILL |
| | BE RESPONSIBLE FOR INSTALLING THEM WHEN A FLOOD EVENT |
| | IS EXPECTED. |
| | |
| | [WATERPROOFING FOR THE WALLS IS NOT SHOWN OR SPECIFIED |
| | ON THE PLANS.] C) SHOW HOW THE WALLS WILL BE WATER |
| | PROOFED UP TO THE DESIGN FLOOD ELEVATION OF 9.0' NAVD |
| | 88. |
| | |
| | [ ANY EQUIPMENT THAT CAN BE DAMAGED FROM FLOOD WATERS |
| | ARE REQUIRED TO BE PROTECTED.] D) THE PLANS SHOW |
| | KITCHEN EQUIPMENT AND A MEDIA CABINET IN THE OUTSIDE |
| | BAR AREA. SPECIFY HOW THAT AREA WILL BE PROTECTED FROM |
| | FLOOD WATERS. |
| | |
| | [ THERE IS NOTHING SHOWN ON THE PLANS OR ANY ENGINEER'S |
| | CALCULATIONS TO SHOW THAT THE WALLS ARE CAPABLE OF |
| | WITHSTANDING THE FORCES OF FLOOD WATERS. ] E) PROVIDE |
| | ENGINEERING TO SHOW THAT THE WALLS OF THE BEACH CLUB |
| | WILL BE ABLE TO WITHSTAND THE STATIC AND DYNAMIC |
| | PRESSURES FROM FLOOD WATERS UP TO THE DESIGN FLOOD |
| | ELEVATION OF 9.0' NAVD 88. |
| | |
| | I WILL SEND YOU THE REQUIRED FLOOD PROOFING CERTIFICATE |
| | FORM AND THE NFPI TECHNICAL BULLETIN ON THE |
| | REQUIREMENTS FOR DESIGN AND CERTIFICATION OF DRY FLOOD |
| | PROOFING... JUST LET ME KNOW WHERE TO SEND IT. |
| | |
| | (PREVIOUS COMMENT) SHEET A1.420 SPECIFIES THE FINISH |
| | FLOOR ELEVATION FOR THE BEACH CLUB AS 7.64' NAVD 88. |
| | SUBMIT THE PRE-CONSTRUCTION ELEVATION CERTIFICATE THAT |
| | WAS SUBMITTED FOR THE BEACH CLUB UNDER PERMIT #18100526 |
| | HAS THE FFE AS 9.0' NAVD 88. PLEASE CLARIFY. |
| | THE PROPERTY IS LOCATED IN AN AE FLOOD ZONE WITH A BASE |
| | FLOOD ELEVATION OF 7' NAVD88. THE CITY'S FLOOD |
| | ORDINANCE REQUIRES A 2' FREEBOARD WHICH MAKES THE |
| | DESIGN FLOOD ELEVATION FOR THIS PROJECT 9.0'. ALL |
| | EQUIPMENT SERVICING THE BUILDING IS REQUIRED TO BE AT |
| | OR ABOVE 9' NAVD. ELEVATION CERTIFICATES WILL BE |
| | REQUIRED TO SHOW COMPLIANCE WITH THE CITY'S FLOOD |
| | POLICY. THE CITY REQUIRES THREE ELEVATION CERTIFICATES. |
| | THE PRECONSTRUCTION ELEV. CERT. BASED ON THE |
| | CONSTRUCTION DRAWING HAS BEEN SUBMITTED. THE SECOND, A |
| | CONSTRUCTION ELEV. CERT. BASED ON THE LOWEST FLOOR |
| | FORMS AND THE THIRD A FINAL ELEV. CERT. BASED ON THE |
| | FINISHED BUILDING ARE TO BE SUBMITTED IN A TIMELY |
| | MANNER. THE CITY'S FLOOD ORDINANCE ARTICLE XVII - FLOOD |
| | PREVENTION AND CONTROL SEC. 94-546 - PROVISIONS FOR |
| | FLOOD HAZARD REDUCTION. |
| | |
| | 3) WILL COMPLY. A SEPARATE ROOF PERMIT IS REQUIRED. |
| | PRIOR TO INSTALLATION, SUBMIT ROOF PERMIT APPLICATION |
| | WITH PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD |
| | AND ENGINEERING (IF APPLICABLE). |
| | |
| | 4) WILL COMPLY. DEFERRED SUBMITTALS REQUESTED BY |
| | ARCHITECT. DOCUMENTS SHOWING COMPLIANCE ARE TO BE |
| | REVIEWED BY DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | (ARCHITECT OR ENGINEER FOR PRODUCT APPROVALS AND OTHER |
| | SPECIFICATION DOCUMENTS, STRUCTURAL ENGINEER OF RECORD |
| | APPROVAL AND REVIEW IS REQUIRED FOR DELEGATED |
| | ENGINEERING). SUBMITTAL, REVIEW AND APPROVAL ARE |
| | REQUIRED PRIOR TO INSTALLATION. |
| | |
| | 5) WILL COMPLY. COMPONENT & CLADDING PRODUCT APPROVALS |
| | REVIEWED BY DESIGNER OF RECORD ARE TO BE SUBMITTED TO |
| | THE BUILDING DIVISION, REVIEWED AND ISSUED PRIOR TO |
| | INSTALLATION. CONFIRM COMPLIANCE WITH PRESSURES SHOWN |
| | ON SHEET S6.0 - S6.3 PRIOR TO SUBMITTAL. IF PRODUCT |
| | APPROVAL OFFERS OPTIONS, INDICATE OPTION PROPOSED, |
| | ESPECIALLY IF NOT ALL OPTIONS COMPLY WITH MINIMUM |
| | DESIGN PRESSURES. |
| | |
| | 6) WILL COMPLY. SEPARATE PERMITS (APPLICATIONS, PLANS, |
| | AND FEES) ARE REQUIRED FOR: |
| | LIGHT POLES/SITE LIGHTING |
| | FIRE ALARM |
| | FIRE SPRINKLER |
| | LOW VOLTAGE |
| | ACCESS |
| | LANDSCAPING |
| | IRRIGATION |
| | PARKING LOT |
| | SWIMMING POOLS AND SPAS |
| | GENERATORS |
| | ALL OTHER ITEMS OTHER THAN BMEP |
| | |
| | 7) WILL COMPLY. CONSTRUCTION HOURS - 7AM TO 7PM |