| 2022-07-13 14:24:53 | FBC = FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | FBC B = FBC BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | |
| | DENIED - * NOTE: THE BEACH CLUB WAS PREVIOUSLY REVIEWED |
| | UNDER PERMIT #18100526. SOME OF THE CONSTRUCTION |
| | DOCUMENTS ARE WITH PERMIT #18100526. |
| | |
| | 1) PROPERTY TO BE REPLATTED PRIOR TO ISSUANCE OF THE |
| | FIRST C.O. PER SECTION 6(2)(E)(II) OF RESOLUTION NO. |
| | 185-18 (THE "DEVELOPMENT ORDER"). |
| | |
| | 2) SHEET A1.420 SPECIFIES THE FINISH FLOOR ELEVATION |
| | FOR THE BEACH CLUB AS 7.64' NAVD 88. THE |
| | PRE-CONSTRUCTION ELEVATION CERTIFICATE THAT WAS |
| | SUBMITTED FOR THE BEACH CLUB UNDER PERMIT #18100526 HAS |
| | THE FFE AS 9.0' NAVD 88. PLEASE CLARIFY. |
| | THE PROPERTY IS LOCATED IN AN AE FLOOD ZONE WITH A BASE |
| | FLOOD ELEVATION OF 7' NAVD88. THE CITY'S FLOOD |
| | ORDINANCE REQUIRES A 2' FREEBOARD WHICH MAKES THE |
| | DESIGN FLOOD ELEVATION FOR THIS PROJECT 9.0'. ALL |
| | EQUIPMENT SERVICING THE BUILDING IS REQUIRED TO BE AT |
| | OR ABOVE 9' NAVD. ELEVATION CERTIFICATES WILL BE |
| | REQUIRED TO SHOW COMPLIANCE WITH THE CITY'S FLOOD |
| | POLICY. THE CITY REQUIRES THREE ELEVATION CERTIFICATES. |
| | THE PRECONSTRUCTION ELEV. CERT. BASED ON THE |
| | CONSTRUCTION DRAWING HAS BEEN SUBMITTED. THE SECOND, A |
| | CONSTRUCTION ELEV. CERT. BASED ON THE LOWEST FLOOR |
| | FORMS AND THE THIRD A FINAL ELEV. CERT. BASED ON THE |
| | FINISHED BUILDING ARE TO BE SUBMITTED IN A TIMELY |
| | MANNER. THE CITY'S FLOOD ORDINANCE ARTICLE XVII - FLOOD |
| | PREVENTION AND CONTROL SEC. 94-546 - PROVISIONS FOR |
| | FLOOD HAZARD REDUCTION. |
| | |
| | 3) A SEPARATE ROOF PERMIT IS REQUIRED. PRIOR TO |
| | INSTALLATION, SUBMIT ROOF PERMIT APPLICATION WITH |
| | PRODUCT APPROVALS REVIEWED BY DESIGNER OF RECORD AND |
| | ENGINEERING (IF APPLICABLE). |
| | |
| | 4) DEFERRED SUBMITTALS REQUESTED BY ARCHITECT. |
| | DOCUMENTS SHOWING COMPLIANCE ARE TO BE REVIEWED BY |
| | DESIGNER OF RECORD PRIOR TO SUBMITTAL (ARCHITECT OR |
| | ENGINEER FOR PRODUCT APPROVALS AND OTHER SPECIFICATION |
| | DOCUMENTS, STRUCTURAL ENGINEER OF RECORD APPROVAL AND |
| | REVIEW IS REQUIRED FOR DELEGATED ENGINEERING). |
| | SUBMITTAL, REVIEW AND APPROVAL ARE REQUIRED PRIOR TO |
| | INSTALLATION. |
| | |
| | 5) COMPONENT & CLADDING PRODUCT APPROVALS REVIEWED BY |
| | DESIGNER OF RECORD ARE TO BE SUBMITTED TO THE BUILDING |
| | DIVISION, REVIEWED AND ISSUED PRIOR TO INSTALLATION. |
| | CONFIRM COMPLIANCE WITH PRESSURES SHOWN ON SHEET S6.0 - |
| | S6.3 PRIOR TO SUBMITTAL. IF PRODUCT APPROVAL OFFERS |
| | OPTIONS, INDICATE OPTION PROPOSED, ESPECIALLY IF NOT |
| | ALL OPTIONS COMPLY WITH MINIMUM DESIGN PRESSURES. |
| | |
| | 6) SEPARATE PERMITS (APPLICATIONS, PLANS, AND FEES) ARE |
| | REQUIRED FOR: |
| | LIGHT POLES/SITE LIGHTING |
| | FIRE ALARM |
| | FIRE SPRINKLER |
| | LOW VOLTAGE |
| | ACCESS |
| | LANDSCAPING |
| | IRRIGATION |
| | PARKING LOT |
| | SWIMMING POOLS AND SPAS |
| | GENERATORS |
| | ALL OTHER ITEMS OTHER THAN BMEP |
| | |
| | 7) CONSTRUCTION HOURS - 7AM TO 7PM MON-FRI, 8AM TO 8PM |
| | SAT-SUN |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |