| 2020-12-23 09:31:54 | SFR REMODEL AND GUEST HOUSE ADDITION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) PLEASE SHOW THE CEILING HEIGHT AT THE BEDROOMS WITH |
| | THE POURED UP FLOORS. FBC R305 |
| | 2) PLEASE SHOW ROOF SLOPE IF ANY AT ADDED FRONT PORCH |
| | ROOF. FBC R903.4 |
| | 3) DRAWING S4 HAS A STRAPPING SCHEDULE BUT THE ROOF |
| | FRAMING PLAN DOES NOT SHOW THE LOCATION OF THE JOIST |
| | STRAPPING. |
| | 4) DRAWING S4 HAS DETAIL CUTS WITH THE WRONG DRAWING |
| | LOCATION SHOWN. |
| | 5) PLEASE SHOW THE REQUIRED TERMITE PROTECTION FOR THE |
| | ADDITIONS - FBC R318.1 |
| | 6) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE ROOFING SYSTEMS, EXTERIOR |
| | WINDOWS, EXTERIOR DOORS - (AS LISTED ON THE DRAWINGS). |
| | 7) ROOFING SYSTEMS, WINDOW AND DOOR PRODUCT APPROVALS |
| | MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE |
| | DEFERRED ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 |
| | DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| | DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| | THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY |
| | SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE |
| | BUILDING OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL |
| | IN RESPONSIBLE CHARGE SHALL LIST THE DEFERRED |
| | SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |
| | |
| | |