| Plan Review Notes For Permit 20120204 |
| Permit Number |
20120204 |
|
| Review Stop |
SIGNATURE |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2021-02-08 08:08:26 | THE ENGINEER'S DIGITAL SIGNATURE ON THE GENERATOR PAD | | | CAN NOT BE VERIFIED. UPLOAD A GENERATOR PAD DRAWING | | | WITH A VALID ELECTRONIC SIGNATURE. ELECTRONICALLY | | | SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S | | | DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO | | | SUBMIT THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. | | | AFTER THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN | | | SUBMIT THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING | | | DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL | | | HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE | | | DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE | | | SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15 | | | |
|