| Plan Review Notes For Permit 20120204 |
| Permit Number |
20120204 |
|
| Review Stop |
SIGNATURE |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2021-01-20 11:23:08 | THE ENGINEER'S DIGITAL SIGNATURE ON THE GENERATOR PAD | | | CAN NOT BE VERIFIED. UPLOAD GENERATOR PAD DRAWING WITH | | | A VALID ELECTRONIC SIGNATURE. ELECTRONICALLY SUBMITTED | | | DRAWINGS ARE REQUIRED TO HAVE THE ENGINEER'S DIGITAL | | | SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT | | | THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER | | | THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT | | | THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING | | | DEPARTMENT TO BE VERIFIED. THE ENGINEER'S ORIGINAL | | | HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO BE ON THE | | | DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF THE | | | SIGNATURE ARE ACCEPTABLE. FS 471 & 61G15 | | | |
|