| 2021-01-04 13:30:22 | NEW 2 STORY OFFICE/DAYCARE |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) EXISTING BUILDING DEMO NEEDS TO BE ON A SEPARATE |
| | PERMIT WITH A SEPARATE PERMIT NUMBER - PLEASE |
| | ACKNOWLEDGE THIS REQUIREMENT. |
| | 2) SEPARATE PERMIT IS REQUIRED FOR PAVING/PARKING. |
| | 3) PLEASE PROVIDE A COMPLETE MIAMI DADE OR FLORIDA |
| | STATE PRODUCT APPROVAL FOR THE ROOFING SYSTEM AND SUB |
| | PERMIT APPLICATION FOR THE ROOFING. |
| | 4) PLEASE PROVIDE A COMPLETE MIAMI DADE OR FLORIDA |
| | STATE PRODUCT APPROVAL FOR THE EXTERIOR WINDOWS, DOORS, |
| | LOUVERS ETC. |
| | 5) ALL PRODUCT APPROVALS AND SHOP DRAWINGS NEED TO BE |
| | REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER |
| | OF RECORD. |
| | 6) PLEASE PROVIDE A COPY OF THE SIGNED AND SEALED SOIL |
| | REPORT. |
| | 7) ROOFING SUBMITTAL AND WINDOW AND DOOR PRODUCT |
| | APPROVALS MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS |
| | TO BE DEFERRED ON THE CONSTRUCTION DOCUMENTS - |
| | 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| | DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| | IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| | THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| | UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| | APPROVED BY THE BUILDING OFFICIAL. |