| 2021-03-18 15:13:29 | 03/18/21 TALKED TO DUANE BURROWES (ARCH.) TO GO OVER |
| | COMMENTS. NEED TO REVISE THE RAMP EXTENSION DETAILS. |
| | SEE COMMENTS BELOW. JG. |
| | |
| | FOURTH BUILDING REVIEW COMMENTS FOR REVISED DRAWINGS TO |
| | COMPLY WITH PROVISO: |
| | |
| | 1- SHEET A4.2: |
| | A)OK. |
| | |
| | ORIGINAL COMMENT: |
| | B)DETAIL #16 RAMP AND STAIR DETAILS: NEED TO SHOW THE |
| | TOP AND BOTTOM EXTENSIONS AT RAMP. AND PROVIDE DETAILS. |
| | SEC. 505.10.1 FBC-ACCESSIBILITY. |
| | |
| | NOTE: SEE SECTION 505.10.1 FBC-ACCESSIBILITY AND FIGURE |
| | 505.10.1 FBC-ACCESSIBILITY FOR HANDRAIL EXTENSION |
| | DETAIL AT RAMPS AND PROVIDE DETAIL AS REQUIRED. |
| | |
| | |
| | RESPONSE: |
| | TALKED TO DUANE BURROWES (ARCH.). BOTTOM EXTENSION AT |
| | RAMP SHOWN ON NEW DETAIL #19/A4.2 DOESN'T COMPLY. THE |
| | EXTENSIONS (TOP AND BOTTOM) SHALL RETURN TO A WALL, |
| | GUARD, OR THE LANDING SURFACE, OR SHALL BE CONTINUOUS |
| | TO THE HANDRAIL OF AN ADJACENT RAMP RUN AS REQUIRED BY |
| | SECTION 505.10.1 FBC-ACCESSIBILITY. REVISE AS REQUIRED. |
| | ALSO REVISE DETAIL 24/A4.3 AS REQUIRED. AND, PROVIDE |
| | DETAILS FOR TOP RAMP EXTENSION. SEE FIGURE 505.10.1 |
| | FBC-ACCESSIBILITY. |
| | |
| | |
| | IMPORTANT: |
| | ACCORDING TO PICTURE UPLOADED TO PROJECTDOX ON 03/01/21 |
| | THE RAMP EXTENSIONS DON'T COMPLY. TOP AND BOTTOM RAMP |
| | EXTENSIONS DON'T COMPLY AND IS MISSING A PORTION OF THE |
| | HANDRAIL. COORDINATE WITH DETAIL #23 ON SHEET A4.3 AND |
| | ABOVE COMMENTS. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| | QUESTIONS REGARDING THESE COMMENTS, |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |