| 2021-01-07 13:19:31 | 2ND REVIEW FBC-2017 PLUMBING |
| | PERMIT- 20110733 |
| | 1/7/2021 |
| | |
| | CODES IN EFFECT: |
| | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017 |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | COMMENTS FROM THE 1ST REVIEW LISTED BELOW ARE MARKED AS |
| | PASSED OR FAILED. NOTES IN CAP LETTERS HAVE BEEN ADDED |
| | TO SOME COMMENTS FOR CLARIFICATION. THE REQUESTED |
| | NARRATIVE WHICH WOULD HELP EXPEDITE THE PLUMBING PLAN |
| | REVIEW PROCESS WAS NOT SUBMITTED. PLEASE PROVIDE A |
| | WRITTEN RESPOPNSE TO THE COMMENTS. |
| | |
| | 1) FAILED. PROVIDE PLUMBING PLANS AND SPECIFICATIONS. A |
| | THOROUGH REVIEW CANNOT BE ACCOMPLISHED WITH THE |
| | FOLLOWING DETAILS, DRAWINGS, SPECIFICATIONS AND |
| | INFORMATION ON THE PLANS: INCOMPLETE RESPONSES-SEE |
| | BELOW. |
| | |
| | A) PASSED. CODE COMPLIANCE DATA: PROVIDE A LIST OF |
| | CURRENT CODES AND STANDARDS USED IN THE DESIGN OF THE |
| | PROJECT- SECTION 107.2.1 WPB. |
| | |
| | B) FAILED. COMPLIANCE METHOD PER THE FLORIDA EXISTING |
| | BUILDING CODE- SEE SECTION 301.3 FBC EX. |
| | |
| | C) FAILED. OCCUPANCY CLASSIFICATION- CHAPTER 3 FBC B. |
| | |
| | D) FAILED. OCCUPANCY LOAD CALCULATIONS- TABLE 1004.5 |
| | FBC B. |
| | |
| | E) FAILED. PLUMBING FIXTURE CALCULATIONS PER TABLE |
| | 403.3 FBC P. PROVIDE A SCHEDULE OF REQUIRED AND |
| | PROVIDED PLUMBING FIXTURES- SECTION 107.3.5.1.3 WPB. |
| | |
| | F) FAILED. SANITARY AND WATER RISER LAYOUT AND RISER |
| | DRAWINGS- SECTION 107.3.5.1.3 WPB. SANITARY RISER |
| | DRAWING PROVIDED ONLY FOR UNIT 612. |
| | |
| | G) PASSED. WATER SERVICE AND BACKFLOW PREVENTION- |
| | SECTION 603.1 & 604.1 FBC P, & SECTION 107.3.5.1.3 WPB. |
| | PLEASE NOTE A SEPARATE PERMIT IS REQUIRED FOR WATER |
| | SERVICE BACKFLOW PREVENTERS- SECTION 105.1 & 107.2.1 |
| | WPB. WATER SERVICE NOW SHOWN AS EXISTING AND NO NEW |
| | BACKFLOW PREVENTER. A REDLINE NOTE WILL BE ADDED TO |
| | APPROVED PLANS. |
| | |
| | H) FAILED. WATER HEATERS AND HOT AND TEMPERED WATER |
| | SYSTEMS- SECTION 107.3.5.1.3 WPB, AND SECTIONS 502.1 & |
| | 607.1 FBC P. REQUIRED TEMPERED WATER FOR LAVATORY NOT |
| | PROVIDED- SECTION 416.5 FBC P. |
| | |
| | I) FAILED. PLUMBING FIXTURE SCHEDULES- SECTION |
| | 107.3.5.1.3 WPB, AND SECTION 405 FBC P. ACCESSIBLE |
| | PLUMBING FIXTURES MAY BE SELECTED "BY OWNER" AS NOTED |
| | ON THE PLAN HOWEVER THEY SHALL BE DESIGNATED AS |
| | DEFERRED SUBMITTALS REQUIRING APPROVAL BY THE DESIGN |
| | PROFESSIONALS- SECTION 107.3.4.1 WPB. |
| | |
| | J) PASSED. PLUMBING PIPING AND INSULATION |
| | SPECIFICATIONS- SECTION 107.3.5.1.3 WPB. |
| | |
| | L) FAILED. ACCESSIBILITY DETAILS AND DRAWINGS IN |
| | ACCORDANCE WITH SECTIONS 211, 212, 213, AND CHAPTER 6 |
| | FBC ACC. SEE REQUIRED DETAILS LIST BELOW UNDER NEW |
| | COMMENT #5. |
| | |
| | 2) DEFERRED. PROVIDE A PLUMBING SUB-PERMIT APPLICATION- |
| | SECTION 105.1 WPB. THE PLUMBING SUB-PERMIT APPLICATION |
| | SHALL BE SUBMITTED AND ONSITE PRIOR TO COMMENCEMENT OF |
| | PLUMBING WORK. A REDLINE NOTE WILL BE ADDED TO APPROVED |
| | PLANS. |
| | |
| | 3) DEFERRED PLEASE NOTE SEPARATE PERMITS ARE REQUIRED |
| | FOR GAS PIPING, IRRIGATION SYSTEM, AND WATER SERVICE |
| | BACKFLOW PREVENTERS- SECTIONS 105.1 & 107.2.1 WPB. A |
| | REDLINE NOTE WILL BE ADDED TO APPROVED PLANS FOR |
| | IRRIGATION. THE PLANS DO APPEAR TO INDICATE NEW GAS |
| | PIPING OR BACKFLOW PREVENTERS. |
| | |
| | NEW COMMENTS. |
| | |
| | 1) SHEET P2: PROVIDE SANITARY ISOMETRIC DRAWINGS FOR |
| | UNITS 614, 616, 618, AND 620- SECTION 107.3.5.1.3 WPB. |
| | |
| | 2) P1.0, P1.1, P2.0: PROVIDE FULL OPEN SHUTOFF VALVES |
| | FOR THE WATER DISTRIBUTION SUPPLY PIPES AT THE |
| | ENTRANCES OF EACH UNIT- SECTION 606.1(2) FBC P. |
| | |
| | 3) P1.0, P1.1, P2.0: INDICATE TEMPERED WATER WILL BE |
| | PROVIDED TO THE LAVATORIES USING A TEMPERATURE LIMITING |
| | DEVICE (MIXING VALVE) IN ACCORDANCE WITH SECTIONS 416.5 |
| | & 617.2.1 FBC P. |
| | |
| | 4) P2.0: PLEASE PROVIDE EQUIPMENT SCHEDULES FOR THE NEW |
| | WATER HEATERS INDICATING MAKES, MODELS, AND EFFICIENCY |
| | RATINGS- TABLE C404.2 FBC EC. |
| | |
| | 5) ACCESSIBLE PLUMBING FIXTURE DETAILS- FBC 17 ACC: |
| | A) CLEAR FLOOR SPACE DIAGRAMS AND DIMENSIONS FOR THE |
| | WATER CLOSETS- SECTION 604.3. |
| | B) CLEAR FLOOR SPACE DIAGRAMS AND DIMENSIONS FOR THE |
| | LAVATORIES- SECTION 606.2. |
| | C) TURNING SPACE DIAMETERS- SECTION 304.3. |
| | D) CENTERLINES OF THE WATER CLOSETS FROM THE SIDE |
| | WALLS- SECTION 604.2. |
| | E) HEIGHTS OF THE WATER CLOSET SEATS FROM THE FINISHED |
| | FLOORS- SECTION 604.4. |
| | F) HEIGHTS OF THE MIRRORS FROM THE FINISHED FLOORS TO |
| | THE REFLECTIVE SURFACES- SECTION 603.3 |
| | G) LOCATIONS, LENGTHS, AND MOUNTING HEIGHTS OF GRAB |
| | BARS FOR THE WATER CLOSETS- SECTION 604.5 & 609.4 |
| | H) LOCATIONS OF THE WATER CLOSET FLUSH CONTROLS - |
| | SECTION 604.6. |
| | I) CENTERLINES OF THE TOILET PAPER DISPENSER MEASURED |
| | FROM THE FRONTS OF THE WATER CLOSETS- SECTION 604.7. |
| | K) KNEE AND TOE CLEARANCES FOR THE LAVATORIES- SECTION |
| | 606.2 |
| | SHOWERS-TRANSFER TYPES. |
| | L) SHOWER DIMENSIONS- SECTION 608.2.1. |
| | M) CLEAR FLOOR SPACE DIAGRAM AND DIMENSIONS FOR THE |
| | SHOWER- SECTION 608.2.1 |
| | N) LOCATIONS, LENGTHS, AND MOUNTING HEIGHTS OF GRAB |
| | BARS FOR THE ACCESSIBLE SHOWER- SECTION 608.3 AND |
| | 608.3.1 |
| | O) LOCATION OF CONTROL, FAUCET, AND SHOWER SPRAY IN THE |
| | SHOWER- SECTION 608.5.1. |
| | P) SHOWER SPRAY UNIT SPECIFICATIONS PER SECTION 608.6. |
| | SHOWER- ROLL IN TYPES. |
| | Q) SHOWER DIMENSIONS- SECTION 608.2.2. |
| | R) CLEAR FLOOR SPACE DIAGRAM AND DIMENSIONS FOR THE |
| | SHOWER- SECTION 608.2.2.1 |
| | S) LOCATIONS, LENGTHS, AND MOUNTING HEIGHTS OF GRAB |
| | BARS FOR THE ACCESSIBLE SHOWER- SECTION 608.3.2 AND |
| | 609.4. |
| | T) LOCATION OF CONTROL, FAUCET, AND SHOWER SPRAY IN THE |
| | SHOWER- SECTION 608.5.2 & 608.6. |
| | U) SHOWER SPRAY UNIT SPECIFICATIONS PER SECTION 608.6. |
| | |
| | 6) PROVIDE ENLARGED SHOWER PAN AND THRESHOLD |
| | INSTALLATION DETAILS IN ACCORDANCE WITH SECTION 417.3- |
| | 417.5.2 FBC P, AND SECTION 608.7 FBC ACC. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE NOTE THAT ADDITIONAL PLUMBING |
| | COMMENTS MAY OCCUR AFTER THE PLANS ARE SUBMITTED AND |
| | REVIEWED. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |