2020-12-03 14:47:301ST REVIEW FBC-2017 PLUMBING
 PERMIT- 20110399
 12/3/2020
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017
 FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 201
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
 PLEASE NOTE THE PLUMBING REVIEW OF THE PROPOSED PROJECT
 DID NOT INCLUDE A REVIEW OF THE PLUMBING SYSTEMS,
 FIXTURES, EQUIPMENT, DEVICES ETC. INSTALLED INSIDE THE
 STERIS MOBILE SPD UNIT. AT THE TIME OF THIS REVIEW IT
 WAS NOT DETERMINED IF THE WPB BUILDING DEPT. WILL BE
 THE AGENCY RESPONSIBLE TO PERFORM PLAN REVIEWS AND
 INSPECTIONS OF THE UNIT.
  
 1) PROVIDE DOCUMENTATION TO VERIFY THE STERIS MOBILE
 SPD UNIT IS A FL. STATE APPROVED MANUFACTURED BUILDING
 PER SECTION 107.3 (1) WPB AMENDMENTS TO THE FBC-17.
  
 2) REFER TO SECTIONS 449.1.1 & 499.3.3 FBC B: PROVIDE
 DOCUMENTATION TO VERIFY THE MOBILE UNIT HAS BEEN
 APPROVED FOR USE AT THE HOSPITAL BY AHCA- AGENCY FOR
 HEALTH CARE ADMINISTRATION; AND HAS BE DESIGNED AND
 CONSTRUCTED IN ACCORDANCE WITH THE APPLICABLE
 REQUIREMENTS OF THE FBC-17, THE GUIDELINES FOR DESIGN
 AND CONSTRUCTION OF HOSPITALS AND OUTPATIENT
 FACILITIES, PART 3 OUTPATIENT FACILITIES, CHAPTER 3.13
 SPECIFIC REQUIREMENTS FOR MOBILE, TRANSPORTABLE, AND
 RELOCATABLE UNITS.
  
 3) SHEET P3.0: PROVIDE WATER SERVICE PIPE AND WATER
 DISTRIBUTION PIPE SPECIFICATIONS- SECTIONS 605.3 &
 605.4 FBC P.
  
 4) P3.0: PROVIDE SANITARY SEWER PIPE AND SANITARY
 DRAINAGE PIPE SPECIFICATIONS- SECTION 702 FBC P. REFER
 TO SECTION 603.2 FOR WATER SERVICE AND SERVICE PIPE
 MATERIALS IN THE SAME TRENCH AND VERIFY COMPLIANCE.
  
 5) P3.0: PROVIDE THE EFFICIENCY RATINGS OF THE WATER
 HEATERS IN THE SCHEDULE- TABLE 404.2 FBC EC.
  
 6) PROVIDE HOT WATER PIPE INSULATIONS SPECIFICATIONS-
 SECTION 607.5 FBC P.
  
 7) P3.2: REFER TO SECTION 712.3.1 FBC P AND VERIFY THE
 EXISTING SEWAGE EJECTOR HAS LARGE ENOUGH CAPACITY AND
 HEAD TO EJECT THE INCREASED SEWER LOAD.
  
 8) P3.1 & P3.2: REFER TO PAGE 50 OF THE STERIS MOBILE
 SPD GUIDE. THE GUIDE RECOMMENDS INSTALLATION OF A P
 TRAP ON THE SEWER LINE TO MINIMIZE POTENTIAL ODORS.
  
 9) P3.1 & P3.2: INDICATE WHICH EQUIPMENT SHOWN ON PAGE
 8 OF THE MOBILE MANUAL IS DISCHARGING WASTE AND
 CONDENSATION. PLEASE NOTE THAT AN APPROVED DILUTION OR
 NEUTRALIZING DEVICE SHALL BE REQUIRED FOR THE SANITARY
 AND CONDENSATION DRAIN SYSTEMS IF CORROSIVE LIQUIDS,
 SPENT ACIDS OR OTHER HARMFUL CHEMICALS THAT DESTROY OR
 INJURE A DRAIN, SEWER, SOIL OR WASTE PIPE, OR CREATE
 NOXIOUS OR TOXIC FUMES OR INTERFERE WITH SEWAGE
 TREATMENT PROCESSES ARE DRAINING FROM FIXTURES,
 APPLIANCE, OR EQUIPMENT INSIDE THE MOBILE UNIT. AT THIS
 TIME THERE HAS NOT BEEN A REVIEW OF THE PLUMBING
 SYSTEMS AND PROCESSES THAT WILL OCCUR IN THE UNIT. SUCH
 DEVICES SHALL BE AUTOMATICALLY PROVIDED WITH A
 SUFFICIENT SUPPLY OF DILUTING WATER OR NEUTRALIZING
 MEDIUM SO AS TO MAKE THE CONTENTS NON-INJURIOUS BEFORE
 DISCHARGE INTO THE DRAINAGE SYSTEM. THE NATURE OF THE
 CORROSIVE OR HARMFUL WASTE AND THE METHOD OF ITS
 TREATMENT OR DILUTION SHALL BE APPROVED PRIOR TO
 INSTALLATION.
  
 10) P3.2: IT APPEARS THAT PUMPS WILL BE REQUIRED FOR
 THE DRAINAGE FROM THE WATER HEATER AND WATER SOFTENER
 TO DISCHARGE INTO THE EXISTING FLOOR DRAIN- SECTION
 314.1 FBC P. PLEASE REVISE THE DETAILS.
  
 11) P3.1 & P3.2: SHOW THE LOCATIONS OF THE REQUIRED
 CLEANOUTS FOR THE SEWER PIPE- SECTIONS 708.1.3 &
 708.1.4 FBC P.
  
 12) P3.0: PROVIDE EQUIPMENT SCHEDULES FOR THE
 RECIRCULATION PUMP AND MIXING VALVE- SECTION 607.1.2
 FBC P.
  
 13) P3.0 & P3.2: INDICATE HOW THE WATER FILTERING
 SYSTEM WILL BE PROTECTED AGAINST CONTAMINATION- SECTION
 608.3 FBC P.
  
 14) P3.2, BACKFLOW PREVENTER: A FLORIDA LICENSED
 PLUMBING CONTRACTOR SHALL OBTAIN A SEPARATE PERMIT FOR
 INSTALLATION OF THE POTABLE WATER SERVICE BACKFLOW
 PREVENTER IN ACCORDANCE WITH SECTION 105.1 WPB AND
 SECTION 90-33 WPB CODE OF ORDINANCES. THE DEVICE SHALL
 BE TESTED AND CERTIFIED BY THE WPB UTILITIES DEPARTMENT
 PRIOR TO FINAL INSPECTION BY THE WPB BUILDING
 DEPARTMENT. PLEASE CONTACT THE WPB UTILITIES CENTRAL
 OPERATIONS DEPT. AT 561-822-2210 FOR FURTHER
 INFORMATION.
  
 15) PROVIDE A PLUMBING SUB-PERMIT APPLICATION- SECTION
 105.1 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 CCOLE@WPB.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved