| 2020-12-17 16:31:05 | 1ST REVIEW FBC-2017 PLUMBING |
| | PERMIT- 20110397 |
| | 12/17/20 |
| | |
| | CODES IN EFFECT: |
| | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017 |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) PLEASE PROVIDE SANITARY DRAINAGE AND WATER |
| | DISTRIBUTION ISOMETRIC DRAWINGS- SECTION 107.3.5.1.3 |
| | WPB. |
| | |
| | 2) SHEET P0.1: PLEASE PROVIDE A SCHEDULE FOR THE VENDOR |
| | SUPPLIED FIXTURES AND EQUIPMENT IN THE CENTRAL STERILE |
| | - TRIPLE BASIN PROCESSING SINKS, STEAM STERILIZERS, RO |
| | GENERATOR, WASHER/DISINFECTOR, CART WASHERS, SINK |
| | FAUCETS, SPRAYERS ETC. INCLUDE THE MAKES AND MODELS AND |
| | THE AGENCY LISTING APPROVAL NUMBERS- SECTION 422.1 & |
| | 422.2 FBC P. PLEASE NOTE THAT MANUFACTURER'S |
| | SPECIFICATIONS AND INSTALLATION MANUALS FOR ALL |
| | PLUMBING FIXTURES, EQUIPMENT, AND DEVICES MAY BE |
| | DEFERRED SUBMITTALS OR BE ONSITE AT TIME OF INSPECTION- |
| | SECTIONS 107.2.1 AND 107.3.4.1 WPB. |
| | |
| | 3) P2.0, P5.1: PLEASE PROVIDE AN ENLARGED TYPICAL |
| | INDIRECT WASTE DISCHARGE DETAIL FOR THE 3-COMPARTMENT |
| | SINKS IN THE SOILED WORKROOM, AND A TYPICAL INDIRECT |
| | WASTE DISCHARGE DETAIL FOR ALL OTHER FLOOR SINKS |
| | LOCATED UNDER CENTRAL STERIL EQUIPMENT AND FIXTURES- |
| | SECTION 713.3 FBC P. |
| | |
| | 4) P2.0, P5.1: REFER TO SECTION 803.1 FBC P AND PROVIDE |
| | DILUTION OR NEUTRALIZING DEVICES FOR ANY CENTRAL |
| | STERILE FIXTURES OR EQUIPMENT DISCHARGING CORROSIVE |
| | LIQUIDS, ACIDS OR CHEMICALS THAT COULD DAMAGE THE |
| | DRAINAGE SYSTEM OR CREATE NOXIOUS OR TOXIC FUMES. |
| | |
| | 5) P2.0, P5.1: PROVIDE TRAP PRIMERS FOR FLOOR SINKS |
| | WITH SEALS SUBJECT TO EVAPORATION- SECTION 1002.4.1 FBC |
| | P. SHOW THE LOCATIONS ON THE PIPING PLAN AND ISOMETRIC |
| | DRAWING AND PROVIDE INSTALLATION DETAILS. |
| | |
| | 6) P0.1, P2.1, P5.1: PLEASE PROVIDE A SCHEDULE FOR THE |
| | REQUIRED BACKFLOW PREVENTERS TO BE INSTALLED ON SUPPLY |
| | LINES TO THE STERILIZERS, RO GENERATOR AND ALL OTHER |
| | PLUMBING FIXTURES PERFORMING A SPECIAL FUNCTION- SEE |
| | SECTIONS 422.2, 608.3, AND TABLE 608.1 FBC P. PLEASE |
| | SHOW THE BACKFLOW PREVENTER LOCATIONS ON THE PLUMBING |
| | PIPING PLANS AND ISOMETRIC DRAWING, AND PROVIDE AN |
| | INSTALLATION DETAIL. |
| | |
| | 7) P0.1, P2.1, P5.1: SHOW THE LOCATIONS OF THE REQUIRED |
| | WATER HAMMER ARRESTORS FOR SUPPLY LINES TO FIXTURES AND |
| | EQUIPMENT WITH QUICK CLOSING VALVES- SECTION 604.9 FBC |
| | P. |
| | |
| | 8) P0.1, P.2.1, P.51: PROVIDE ENLARGED WATER HEATER |
| | PIPING DETAILS SHOWING POTABLE WATER INLET AND OUTLET |
| | CONNECTIONS, PIPING CONNECTIONS TO RECIRCULATION PUMPS, |
| | BACKFLOW PREVENTERS- SECTION 502.1, 607.2, AND 608.3 |
| | FBC P. PLEASE SHOW HOW STEAM CONDENSATION AND RELIEF |
| | VALVE DISCHARGE WILL BE DRAINED TO AN APPROVED LOCATION |
| | OR WASTE RECEPTOR-SECTION 314.2.1 AND 504.6 FBC P. |
| | |
| | 9) P2.1: INDICATE HOW TEMPERED WATER WILL BE PROVIDED |
| | TO THE LAVATORIES- SECTIONS 416.5 & 607.1.2 FBC P. |
| | |
| | 10) P2.1 & P5.1: PLEASE LABEL THE HW & HWR LINES ON |
| | P2.1 & P5.1, AND THE RO SUPPLY AND RETURN LINES ON |
| | P5.1- SEE NOTE #11 AND SECTION 107.2.1 WPB. |
| | |
| | 11) P5.1: PROVIDE THE CORRESPONDING TEXT FOR KEYNOTES |
| | 12,13, & 14 SHOWN AT THE WATER HEATER/COMPRESSOR ROOM- |
| | SECTION 107.2.1 WPB. |
| | |
| | 12) ROOF AND STORM DRAINS- FBC P. |
| | |
| | A) P2.0 & P2.2: PROVIDE A STORM DRAIN ISOMETRIC DRAWING |
| | SHOWING THE ROOF DRAIN VERTICAL LEADERS, UNDERSLAB |
| | HORIZONTAL STORM DRAINS, AND LOCATIONS OF REQUIRED |
| | CLEANOUTS- SECTIONS 1106.1, 1106.1, & 1108.1. |
| | |
| | B) P2.2: VERIFY THE ROOF AND DRAINAGE SYSTEM HAS BEEN |
| | DESIGNED IN COMPLIANCE WITH SECTION 1101.7 FOR MAXIMUM |
| | DEPTH OF PONDING WATER AND DEFLECTED STRUCTURAL |
| | ELEMENTS. |
| | |
| | C) P2.2: PLEASE SHOW THE PRIMARY AND OVERFLOW SCUPPERS |
| | THAT ARE SHOWN ON SHEET A3.1- SECTION 107.2.1 WPB AND |
| | 1101.7. |
| | |
| | D) PROVIDE SIZING CALCULATIONS FOR THE PRIMARY VERTICAL |
| | LEADERS AND HORIZONTAL BRANCHES BASED ON SECTIONS |
| | 1106.1 & 1106.2. |
| | |
| | E) PROVIDE SIZING CALCULATIONS FOR THE SECONDARY ROOF |
| | DRAINS- SECTION 1108.3. |
| | |
| | 13) PROVIDE CIVIL PLANS SHOWING POINTS OF CONNECTIONS |
| | TO EXISTING SANITARY SEWER AND STORM DRAIN MAINS- |
| | SECTION 107.2.1 WPB. |
| | |
| | 14) PROVIDE A PLUMBING SUB-PERMIT APPLICATIONS- SECTION |
| | 105.1 WPB. |
| | |
| | 15) PLEASE NOTE THAT A FL. LICENSED PLUMBING CONTRACTOR |
| | SHALL OBTAIN A SEPARATE PERMIT FOR INSTALLATION OF THE |
| | BACKFLOW PREVENTERS IN ACCORDANCE WITH SECTION 105.1 |
| | WPB AND SEC, 90-33 WPB CODE OF ORDINANCES. THE DEVICE |
| | SHALL BE TESTED AND CERTIFIED BY THE WPB UTILITIES |
| | DEPARTMENT PRIOR TO FINAL INSPECTION BY THE BUILDING |
| | DEPARTMENT. PLEASE CONTACT THE WPB UTILITIES CENTRAL |
| | OPERATIONS DEPT.AT 561-822-2210 FOR FURTHER |
| | INFORMATION. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | CCOLE@WPB |
| | |