| 2021-01-13 15:24:41 | NEW SFR |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected]. |
| | CODE USED FOR REVIEW - 2017 FBC WITH WPB CHAPTER 1 |
| | AMENDMENTS |
| | |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) FLOOD ZONE IS SHOWN ON DRAWING A-003 AS AE 6 - THE |
| | BUILDING "LOWEST FLOOR" (FBC R322.1.5) WILL NEED TO BE |
| | 8.00 NAVD PER CITY ORDINANCE 4729-17 SEC. 18-33 (1). |
| | BUILDINGS AND STRUCTURES IN FLOOD HAZARD AREAS NOT |
| | DESIGNATED AS COASTAL A ZONES SHALL HAVE THE LOWEST |
| | FLOORS ELEVATED TO OR ABOVE THE BASE FLOOD ELEVATION |
| | PLUS TWO FEET OR THE DESIGN FLOOD ELEVATION, WHICHEVER |
| | IS HIGHER. |
| | 2) PLEASE PROVIDE A PROPOSED ELEVATION CERTIFICATE FOR |
| | BUILDINGS IN FLOOD ZONES (AE6) |
| | 3) PLEASE SHOW EQUIPMENT PAD ELEVATIONS TO MEET |
| | REQUIREMENTS FBC R322.1.6 |
| | 4) ADDING FLOOD VENTS TO A GARAGE OVERHEAD DOOR WILL |
| | VOID THE MIAMI DADE NOA FOR THE OVERHEAD DOOR. PLEASE |
| | PROVIDE A FIX. |
| | 5) PLEASE PROVIDE COMPLETE MIAMI DADE OR FLORIDA STATE |
| | PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS AND DOORS. |
| | 6) PLEASE PROVIDE A COMPLETE MIAMI DADE OR FLORIDA |
| | STATE ROOFING PRODUCT APPROVALS. |
| | 7) ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED |
| | APPROVED BY THE DESIGNER OF RECORD OR LISTED ON THE |
| | DRAWINGS.(PLEASE CHECK THE LISTED PRODUCT APPROVAL |
| | NUMBERS ON THE DRAWINGS - I CANNOT FIND SOME OF THEM ON |
| | THE FLORIDA STATE PRODUCT APPROVAL WEB SITE). |
| | 8) ROOFING SYSTEM AND WINDOW AND DOOR PRODUCT APPROVALS |
| | MAY BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE |
| | DEFERRED ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 |
| | DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| | DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| | THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED |
| | SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| | REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL |
| | WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. |
| | 9) A GUARD RAIL IS REQUIRED FOR THE 2ND FLOOR GUEST |
| | ROOM EXTERIOR DOOR FBC R312 |
| | |
| | |