| Plan Review Notes For Permit 20110320 |
| Permit Number |
20110320 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2021-04-09 05:29:30 | 1) SHT. P0.1 - SUBMIT THE MANUFACTURER'S SPECIFICATIONS | | | AND INSTALLATION MANUAL FOR THE LIBERTY SUMP PUMP. WPB | | | AMEND. TO FBC SEC. 107.2.1. | | | 2) THE SINK IN THE OPEN OFFICE AREA CANNOT DISCHARGE | | | INTO THE WET VENT PER FBC-PLUMBING SEC.912.1. THE SINK | | | SHALL CONNECT TO THE HORIZONTAL DRAI DOWNSTREAM OF THE | | | WATER CCLOSET. | | | 3) A FULL OPEN SHUTOFF VALVE IS REQUIRED ON THE | | | DISCHARGE SIDE OF THE CHECK VALVE ON THE SUMP PUMP PERR | | | FBC- PLUMBING SEC. 712.2. | | | 4) A BACKFLOW DEVICE COMPLYING WITH ASSE 1022 IS | | | REQUIRED ON THE COFFEE MACHINE AND ICEMAKER. | | | FBC-PLUMBING SEC.608.16.10. | | | 5) THE DISHWASHER SHALL BE EQUIPPED WITH A BACKFLOW | | | DEVICE COMPLYING WITH ASSE 1024 PER FBC-PLUMBING TABLE | | | 608.1. | | | 6) SHT. P0.1 - SIZE THE VENT FOR THE SINKS, WATER | | | CLOSET AND LAVATORY. COMPLY WITH FBC-PLUMBING | | | SEC.906.1, TABLE 906.1. THE DIAMETER OF THE VENT SHALL | | | BE NO LESS THAN ONE-HALF THE DIAMETER OF THE DRAIN | | | SERVED. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|