| 2021-01-06 09:12:23 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND |
| | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF |
| | THE PERSON RESPONSIBLE FOR THE DESIGN. |
| | |
| | 2) THE VALUE OF $300.00 APPEARS TO BE LOW FOR THIS |
| | PROJECT. FBC 109.3 BUILDING PERMIT VALUATION. FOR |
| | PERMITTING PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 3) PROVIDE A SITE PLAN THAT SHOWS THE LOCATION OF THE |
| | PROPOSED WORK. IF IT IS UNDER A COVERED PORCH, PROVIDE |
| | DETAILS OF THE PORCH. SHOW WHICH SIDES ARE OPEN, THE |
| | CEILING HEIGHT, CEILING MATERIAL (COMBUSTIBLE OR NOT), |
| | ETC. FBC 107 |
| | |
| | 4) PROVIDE THE MANUFACTURE'S SPECIFICATIONS AND |
| | INSTALLATION REQUIREMENTS WITH REQUIRED CLEARANCES, |
| | ETC. FBC 107 |
| | |
| | 5) PROVIDE STRUCTURAL DRAWINGS OF THE OUTDOOR KITCHEN. |
| | SPECIFY THE FOUNDATION, ALL CONSTRUCTION MATERIALS, |
| | REINFORCING, CONNECTORS, ANCHORS, ETC. FBC 107 |
| | |
| | 6) SHOW THAT THE PROPOSED STRUCTURE IS CAPABLE OF |
| | RESISTING THE REQUIRED WINDLOADS. FBC-R301 |
| | |
| | 7) A THOROUGH AND COMPLETE PLAN REVIEW CANNOT BE |
| | COMPLETED AT THIS TIME DUE TO LACK OF INFORMATION ON |
| | THE SUBMITTED PLANS. ADDITIONAL PLAN REVIEW COMMENTS |
| | MAY BE GENERATED WHEN MORE INFORMATION IS PROVIDED. |
| | |
| | 8) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A |
| | RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE |
| | CITY RE-SUBMITTAL FORM. |
| | |
| | |