| Date |
Text |
| 2020-11-16 13:42:13 | 11/16/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | |
| | 2. PLUMBING RISER DIAGRAM REQUIRED PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.3.5.3 (11) RESIDENTIAL |
| | PLUMBING. |
| | |
| | 3. PLEASE PROVIDE THE SOURCE OF HOT WATER PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | 4. PLEASE PROVIDE THE SIGNATURE OF ALL INFORMATION, |
| | DRAWINGS, SPECIFICATIONS, AND ACCOMPANYING DATA THAT |
| | SHALL BEAR THE PRINTED NAME AND SIGNATURE OF THE PERSON |
| | RESPONSIBLE FOR THE DESIGN PER THE WPB AMENDMENTS TO |
| | THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | 5. A GAS RANGE IS SHOWN ON PLANS AND NOT NOTED, IF IT |
| | WILL BE MOVE PLEASE NOTE A SEPARATE GAS PERMIT WILL BE |
| | REQUIRED WITH A NARRATIVE OF THE SCOPEOF WORK PER THE |
| | WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |