2021-02-10 10:31:1702/10/21 2ND PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PLEASE PROVIDE A PLUMBING RISER DIAGRAM PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.3.5.3 (11) RESIDENTIAL
 PLUMBING.
  
 2. THE GAS HEATER IS IN A SEPARATE BUILDING ACCORDING
 TH THE NEW GAS DRAWING AND IF IT GOING TO HAVE LINE TO
 THE NEW STRUCTURE PLEASE PROVIDE VERBIAGE ON PLAN PER
 THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION
 ON CONSTRUCTION DOCUMENTS.
  
 3. PIPES NOT IN CONDITION SPACE RUNNING TO THE NEW
 STRUCTURE NEED TO BE INSULATED WITH A MINIMUM R-3 PER
 THE 2017 FBC SEC. RE 403.5.3.
  
 4. SIGNED AND SEALED DRAWINGS NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR -
 IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF (CITY HALL DROPBOX) THE
 ORIGINAL SIGNED AND SEALED DOCUMENT ALONG WITH A "PLAN
 REVIEW REQUEST FORM" EXPLAINING THE REASON FOR
 SUBMITTING THE DOCUMENT OR DRAWINGS. THE PLAN REVIEW
 REQUEST FORM CAN BE OBTAINED BY EMAILING [email protected] AND
 ASKING FOR THE FORM.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved