| 2020-11-16 16:53:51 | 11/16/20 2ND PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | |
| | 2. PLUMBING RISER DIAGRAM REQUIRED PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.3.5.3 (11) RESIDENTIAL |
| | PLUMBING. |
| | |
| | 3. A GAS RANGE IS SHOWN ON PLANS AND NOT NOTED, A |
| | SEPARATE GAS PERMIT WILL BE REQUIRED WITH A NARRATIVE |
| | OF THE SCOPE OF WORK OR PROVIDE AT THIS TIME FOR REVIEW |
| | PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1. |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 4. THE WASHING MACHINE IS STACKABLE IN THE GUEST HOUSE |
| | PLEASE SHOW THE LOCATION OF THE VALVE ACCESS, THE |
| | WASHING MACHINE SHUT OFF VALVES SHALL BE ACCESSIBLE |
| | WITHOUT MOVING OF THE UNITS AND WITHIN REACH PER THE |
| | 2017 FBC SEC. R 2903.9.3. |
| | |
| | 5. THE GUEST HOUSE SHOWS A GAS WATER HEATER BUT THE |
| | MAIN HOUSE DOES NOT SHOW ANY WATER HEATER PLEASE |
| | CLARIFY IF THERE ARE TWO OR JUST ON THE UNIT PER THE |
| | WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | 6. THIS IS MULTI-FAMILY DWELLINGS AND WATER USERS WILL |
| | BE REQUIRED TO INSTALL A BACKFLOW PREVENTION ASSEMBLY |
| | AT THE POINT OF DELIVERY. THE TYPE OF BACKFLOW ASSEMBLY |
| | REQUIRED WILL BE DEPENDENT UPON THE DEGREE OF HAZARD |
| | POSED BY THE WATER USER. A REDUCED PRESSURE ZONE |
| | BACKFLOW DEVICE WILL BE REQUIRED AT THE WATER METER PER |
| | THE CITY OF WEST PALM CROSS CONNECTION CONTROL MANUAL. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |