Date Text
2020-12-03 14:40:141ST REVIEW FBC-2017 MECHANICAL
 PERMIT-20101431
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017
 FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017
 FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION
 2017
 FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017
 FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION
 2017
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH
 EDITION 2017
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH
 EDITION 2017
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE PROVIDE HEATING AND COOLING SIZING
 CALCULATIONS. FBC EC C403.2.1
  
 2) SHEET M0.3.1- VENTILATION SCHEDULES INDICATES THE
 PUBLIC TOILET ROOMS EXHAUST FANS ARE EXHAUSTING 50 CFM.
 SHEET M0.2.2 FAN SCHEDULE INDICATES EF-1 EXHAUSTS 75
 CFM AND IS INTERLOCKED WITH WALL LIGHT SWITCH. FBC M
 TABLE 403.3.1.1 NOTE E INDICATES THE 50 CFM MUST BE FOR
 CONTINUOUS OPERATION. PLEASE USE THE 75 CFM IN THE
 VENTILATION CALCULATIONS OR REMOVE CONTROL TYPE 2 AND
 MAKE THE EF-1 CONTINUOUSLY OPERATED.
  
  
 3) SHEET M0.4.2- DETAIL 1: 504.8.5 LENGTH
 IDENTIFICATION.
 WHERE THE EXHAUST DUCT EQUIVALENT LENGTH EXCEEDS 35
 FEET (10 668 MM), THE EQUIVALENT LENGTH OF THE EXHAUST
 DUCT SHALL BE IDENTIFIED ON A PERMANENT LABEL OR TAG.
 THE LABEL OR TAG SHALL BE LOCATED WITHIN 6 FEET (1829
 MM) OF THE EXHAUST DUCT CONNECTION.
  
 4) PLEASE PROVIDE A LETTER FROM THE DRYER MANUFACTURER
 STATING THAT THE X VENT DRYER EXHAUST TERMINATION IS
 ALLOWED WITH EACH SPECIFIC DRYER. THE X VENT IS UNIQUE
 IN THE FACT THAT IT USES BOTH THE BACK-DRAFT DAMPER AND
 THE LOUVER. THE INSTALLATION MANUAL DOES NOT ADDRESS
 THIS KIND OF INSTALLATION. WITH THE X VENT SYSTEM THE
 BOX OF THE X VENT IS MOUNTED INTO THE EXTERIOR OF THE
 WALL AND THE LOUVER IS FLUSH TO THE EXTERIOR WALL. THE
 EXHAUST OF THE DRYER MUST TRAVEL THROUGH THE EXHAUST
 DUCT, OPEN THE BACK-DRAFT DAMPER AND TRAVEL THROUGH THE
 X VENT COVER (LOUVER) BEFORE IT IS EXHAUSTED TO THE
 OUTDOORS. BECAUSE THIS PRODUCT USES BOTH THE BACK-DRAFT
 DAMPER AND THE OUTER COVER OF THE BOX (LOUVER) INSTEAD
 OF EITHER THE BACK-DRAFT DAMPER OR THE LOUVER AS
 TYPICALLY SEEN IN THE MANUFACTURES INSTALLATION MANUAL
 THE OUTER LOUVER IS A RESTRICTION THAT MUST BE
 ADDRESSED. IN LIEU OF THE MANUFACTURES LETTER STATING
 THE MAXIMUM DRYER EXHAUST DUCT TO BE USED WITH THE X
 VENT SYSTEM THE ENGINEER OF RECORD MUST DETERMINE THE
 AMOUNT OF RESTRICTION THIS CREATES AND THE EFFECT TO
 THE DRYER EXHAUST DUCT LENGTH. THE ENGINEER OF RECORD
 MUST SUBMIT THE CALCULATIONS AND PROVIDE MAX. EXHAUST
 DRYER DUCT LENGTHS FOR EACH DRYER USED IN THIS PROJECT.
 FBC M 504.8.4.2
  
 5) SHEET M0.6.1- GARAGE EXHAUST SEQUENCE OF OPERATIONS:
 THE SEQUENCE OF OPERATION MUST ALSO INCLUDE NITROGEN
 DIOXIDE DETECTORS. FBC M 404.1
 404.1ENCLOSED PARKING GARAGES.
 WHERE MECHANICAL VENTILATION SYSTEMS FOR ENCLOSED
 PARKING GARAGES OPERATE INTERMITTENTLY, SUCH OPERATION
 SHALL BE AUTOMATIC BY MEANS OF CARBON MONOXIDE
 DETECTORS APPLIED IN CONJUNCTION WITH NITROGEN DIOXIDE
 DETECTORS. SUCH DETECTORS SHALL BE INSTALLED IN
 ACCORDANCE WITH THEIR MANUFACTURERS? RECOMMENDATIONS.
  
 6) SHEET M1.1.1A: PLEASE SHOW THE DAMPERS AT THE RATED
 WALL AND FLOOR PENETRATIONS FOR THE DUCT WORK GOING UP
 TO AHU-A1 AND AHU-A2. FBC M 607
  
 7) SHEET M1.1.1A: AHU-A2 IS SUPPLYING 1250 CFM?S
 AIRFLOW TO THE LEASING AREA. SHEET M0.2.1 SPLIT SYSTEM
 DX SCHEDULE INDICATES THE AIRFLOW RATE FOR AHU-A2 IS
 700 CFM?S OF AIRFLOW. PLEASE CORRECT THIS. FBC 107.2.1
  
 8) SHEETS M1.1.1A, M1.11.1B, M1.2.1B: AHU-A1 IS
 SUPPLYING 1,800 CFM, SHEET M0.2.1 SPLIT SYSTEM DX
 SCHEDULE INDICATES THAT AHU-A1 IS 1400 CFM?S OF AIR
 FLOW. PLEASE CORRECT THIS. FBC 107.2.1
  
 9) SHEET M1.1.1B: PLEASE MAKE SURE NOTE 8 INCLUDES ALL
 PENETRATIONS IN RATED WALLS. THE WALL SEPARATING THE
 PARKING GARAGE AND THE STORAGE ROOM IS BEING PENETRATED
 BY THE STAIR PRESSURIZATION DUCT WORK.
  
  
 10) SHEET M1.1.1B: THE EF-2 EXHAUST FAN DUCT FOR THE
 GENERATOR ROOM IS PASSING THROUGH SEVERAL 2 HOUR RATED
 WALLS. PLEASE SHOW HOW THE PENETRATIONS IN THESE RATED
 WALLS ARE TO BE PROTECTED. FBC M 607
  
 11) SHEET M1.1.1B: THE GENERATOR EXHAUST PIPE IS
 PENETRATING RATED WALLS AND TRAVELING THROUGH THE
 EGRESS CORRIDOR. PLEASE SHOW HOW THE PENETRATIONS IN
 THE RATED WALLS WILL BE PROTECTED. FBC M607
  
 12) SHEET M1.1.1B: THE GENERATOR EXHAUST PIPE CANNOT
 PASS THROUGH THE EGRESS CORRIDOR. FBC 1024.6
  
 13) SHEET M1.1.1B: EF-6 AND 8; THE DUCTWORK FOR THESE
 EXHAUST FANS ARE PENETRATING SEVERAL RATED WALLS,
 PLEASE SHOW THE RATED DAMPERS AT EACH PENETRATION. FBC
 M607
  
 14) SHEET M1.1.1B:THE FRESH AIR DUCT FOR AHU-A7 IS
 PENETRATING A RATED WALL, PLEASE PROVIDE A RATED DAMPER
 AT THE PENETRATION. FBC M 607
  
 15) SHEET M1.2.1A: EF-1 DUCT WORK IS PENETRATING RATED
 WALLS, PLEASE SHOW RATED DAMPERS AT EACH PENETRATION.
 FBC M 607
  
 16) SHEET M1.2.1A: AHU-3 IS SUPPLYING 2220 CFM?S TO THE
  
 17) SHEET M1.2.1B: THERE ARE NO NOTES ON THIS SHEET.
 NOTE 6 IN THE PARKING GARAGE APPEARS TO BE FOR A
 SENSOR. PLEASE PROVIDE NOTES FOR THIS SHEET. FBC
 107.2.1
  
  
 18) SHEET M1.3.1A: PLEASE SHOW THE DAMPER FOR THE
 ELECTRIC ROOM EXHAUST AT RATED WALL. FBC M 607
  
 19) SHEET M1.4.1A: PLEASE SHOW THE DAMPER FOR THE
 ELECTRIC ROOM EXHAUST AT RATED WALL. FBC M 607
  
 20) SHEET M1.5.1A: PLEASE SHOW THE DAMPER FOR THE
 ELECTRIC ROOM EXHAUST AT RATED WALL. FBC M 607
  
 21) SHEET M1.6.1A: AHU-A4 IS SUPPLYING 2640 CFM TO THE
 FITNESS CENTER AREA, NO CFM?S LABELED FOR THE WOMEN?S
 TOILET ROOM. SHEET M0.2.1 SPLIT SYSTEM DX SCHEDULE
 INDICATES AHU-A4 SUPPLIES 1400CFM?S OF AIR FLOW. PLEASE
 CORRECT THIS. FBC 107.2.1
  
 22) SHEET M1.6.1A: AHU-A5 IS SUPPLYING 1200 CFM TO THE
 EXERCISE ROOM. SHEET M0.2.1 SPLIT SYSTEM DX SCHEDULE
 INDICATES AHU-A5 SUPPLIES 700 CFM TO THE EXERCISE ROOM.
 PLEASE CORRECT THIS. FBC 107.2.1
  
 23) SHEET M1.6.1A: THE OUTDOOR AIR DUCT FOR AHU-A5 FOR
 THE EXERCISE ROOM IS PENETRATING A RATED WALL. PLEASE
 PROVIDE A RATED DAMPER AT THIS PENETRATION. FBC M 607
  
 24) SHEET M1.6.1A: THE OUTDOOR AIR DUCT FOR THE
 VESTIBULE IS PENETRATING A RATED WALL AND APPEARS TO BE
 FLEX DUCT. PLEASE PROVIDE A RATED DAMPER AT THIS
 PENETRATION. FBC M 607
  
 25) SHEET M1.6.1A: PLEASE SHOW THE DAMPER FOR THE
 ELECTRIC ROOM EXHAUST AT RATED WALL. FBC M 607
  
 26) SHEET M1.6.1A: PLEASE IDENTIFY THE EXHAUST FAN FOR
 THE TOILETS IN THE FITNESS CENTER AREA. FBC 107.2.1
  
 27) SHEET M1.6.1A: PLEASE PROVIDE THE CFM?S TO THE
 BATHROOM GRILLE?S PROVIDED BY AHU-A4. FBC M 403.3.1.2
  
 28) SHEET M1.7.1A: PLEASE SHOW THE DAMPER FOR THE
 ELECTRIC ROOM AND STORAGE ROOM EXHAUST AT RATED WALL.
 FBC M 607
  
 29) SHEET M1.8.1A: NOTE 6 DISCUSSES SUPPLY AND EXHAUST
 AIR DUCTWORK SERVING THE DOAS. BUT NOTE 7 LIST THE
 DUCTWORK AS THE RISER FOR THE TRASH ROOM EXHAUST. IT
 APPEARS THAT THIS IS ONE AND THE SAME DUCTWORK. WHY
 WOULD THE TRASH ROOM EXHAUST BE GOING BACK TO THE DOAS
 UNIT? PLEASE MAKE THIS CLEARER FOR THE MECHANICAL
 REVIEWER. FBC 107.2.1
  
 30) SHEET M1.8.1B: NOTE 3 MENTIONS A DUCTLESS AIR
 HANDLER, THE KEYNOTE 3 SYMBOL IS IN THE ELEVATOR LOBBY
 AREA. PLEASE SHOW THE DUCTLESS AIR HANDLER ON THE
 DRAWING AND IDENTIFY IT ON THE SCHEDULES SHEET. FBC
 107.2.1
  
 31) SHEET M1.6.1A: AHU-A4 IS SUPPLYING 2640 CFM TO THE
 FITNESS CENTER AREA, NO CFM?S LABELED FOR THE WOMEN?S
 TOILET ROOM. SHEET M0.2.1 1 SPLIT SYSTEM DX SCHEDULE
 INDICATES AHU_A4 SUPPLIES 1400CFM?S OF AIR FLOW. PLEASE
 CORRECT THIS. FBC 107.2.1
  
 32) SHEET M0.3.1 VENTILATION SCHEDULES: AHU-A1
 INDICATES THAT 210 CFM OF OUTDOOR AIR IS REQUIRED FOR
 THIS AREA OF THE BUILDING. SHEET M0.2.1 SPLIT SYSTEM DX
 SCHEDULE INDICATES AHU-A1 IS SUPPLYING 160 CFM TO THIS
 AREA. PLEASE CORRECT THIS. FBC 107.2.1
  
 33) SHEET M0.3.1 VENTILATION SCHEDULES: AHU-A2
 INDICATES THAT 87 CFM OF OUTDOOR AIR IS REQUIRED FOR
 THIS AREA. SHEET M0.2.1 SPLIT SYSTEM DX SCHEDULE
 INDICATES AHU-A2 IS SUPPLYING 80 CFM TO THIS AREA.
 PLEASE CORRECT THIS. FBC 107.2.1
  
 34) SHEET M0.3.1 VENTILATION SCHEDULES: AHU-A3
 INDICATES THAT 240 CFM OF OUTDOOR AIR IS REQUIRED FOR
 THIS AREA. SHEET M0.2.1 SPLIT SYSTEM DX SCHEDULE
 INDICATES AHU-A3 IS SUPPLYING 125 CFM TO THIS AREA.
 PLEASE CORRECT THIS. FBC 107.2.1
  
 35) SHEET M0.3.1 VENTILATION SCHEDULES: AHU-A4
 INDICATES THAT 385 CFM IS REQUIRED FOR THIS AREA. SHEET
 M0.2.1 SPLIT SYSTEM DX SCHEDULE INDICATES AHU-A4 IS
 SUPPLYING 160 CFM TO THIS AREA. PLEASE CORRECT THIS.
 FBC 107.2.1
  
 36) SHEET M0.2.1 AHU-B INDICATES 750-800 SUPPLY AIR
 FLOW. SHEET M9.1.2 UNIT TYPE 4 INDICATES AHU-B IS
 SUPPLYING 865 CFM FOR THIS UNIT. PLEASE CORRECT THIS.
 FBC EC C403.2.1
  
 37) SHEET M9.1.3: UNIT TYPE 5 SUPPLY DUCT FOR KITCHEN
 AREA IS MISSING THE SUPPLIED CFM?S. PLEASE SHOW THE
 CFM?S FOR THIS AREA. FBC EC C403.2.1
  
 38) SHEET M0.2.1 AHU-B INDICATES 750-800 SUPPLY AIR
 FLOW. SHEET M9.1.8 UNIT TYPE 13 INDICATES 890 CFM BEING
 SUPPLIED TO THIS UNIT. PLEASE CORRECT THIS. FBC EC
 C403.2.1
  
 39) SHEET M0.2.1 AHU-C INDICATES 950-100CFM OF SUPPLY
 AIR FLOW. SHEET M9.1.9 UNIT 15 INDICATES AHU-C IS
 SUPPLYING 1,050 CFM OF AIR FLOW. PLEASE CORRECT. FBC EC
 C403.2.1
  
 40) SHEET M0.2.1 AHU-C INDICATES 950-100 CFM OF SUPPLY
 AIR FLOW. SHEET M9.1.12 UNIT TYPE 17 INDICATES AHU-C IS
 SUPPLYING 1,070 CFM OF AIR FLOW. PLEASE CORRECT. FBC EC
 C403.2.1
  
 41) PLEASE PROVIDE CALCULATIONS FOR THE PARKING GARAGE
 VENTILATION. FBC M 404
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD
 SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER
 SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN
 THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS
 PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS
 PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR
 UPDATED.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved