| 2021-03-15 16:59:34 | FAILED |
| | |
| | 1) UPDATED COMMENT: THE PLANS SHOW POWER BEING RUN FROM |
| | AN FPL POLE TO THE 40TH STREET RIGHT-OF-WAY. PROVIDE A |
| | SURVEY, PREPARED BY A FLORIDA LICENSED SURVEYOR, |
| | CLEARLY SHOWING THAT THIS WORK IS BEING DONE IN A |
| | GENERAL UTILITY EASEMENT OR IN THE ALLEY ADJACENT TO |
| | THE PARCEL. THE SURVEY THAT WAS PROVIDED DOES NOT SHOW |
| | THE LOCATION OF THE FPL POLE, SO STAFF IS UNABLE TO |
| | VERIFY THAT THE POLE IS IN THE ALLEY AS SHOWN ON THE |
| | ENGINEERING PLAN. IF THE POLE (AND THUS THE POWER RUN) |
| | IT IS NOT IN THE ALLEY, OR AN EASEMENT CLEARLY SHOWN ON |
| | THE SURVEY, THEN IT MAY NOT BE INSTALLED IN THE |
| | LOCATION SHOWN. |
| | |
| | 2) UPDATED COMMENT: IF THE POWER RUN INSTALLATION IS |
| | SHOWN BY THE SURVEY TO BE IN THE ALLEY, THEN YOU MUST |
| | SUBMIT AND HAVE APPROVED A COMMUNICATIONS FACILITIES |
| | PLACEMENT PERMIT APPLICATION FOR CITY RIGHTS-OF-WAY FOR |
| | THE FIBER INSTALLATION IN BOTH THE ALLEY AND THE 40TH |
| | STREET RIGHT-OF-WAY. ANY PORTION OF THE POWER RUN ON |
| | PRIVATE PROPERTY WITHIN AN EASEMENT IS NOT REQUIRED TO |
| | BE PART OF THE COMMUNICATIONS FACILITIES PLACEMENT |
| | PERMIT APPLICATION FOR CITY RIGHTS-OF-WAY EXCEPT FOR |
| | INFORMATIONAL PURPOSES. |
| | |
| | 3) REPEAT COMMENT: PROVIDE A COPY OF THE FDOT APPROVAL |
| | FOR THE WORK WITHIN THE BROADWAY AVENUE RIGHT-OF-WAY. |
| | |
| | 4) REPEAT COMMENT: THE PROPOSED WIRELESS FACILITY (POLE |
| | WITH EXTERIOR MOUNTED EQUIPMENT) DOES NOT MEET THE CITY |
| | OF WEST PALM BEACH CONCEALMENT (STEALTH), STYLE |
| | REQUIREMENTS LISTED IN SECTIONS 78-411(E), 78-411(F) |
| | AND 78-411(G) OF THE CITY CODE. PROVIDE A POLE THAT |
| | MEETS THE CITY CODE REQUIREMENTS. NOTE: VERIZON HAS |
| | SHOWN POLES ON OTHER APPLICATIONS FOR OTHER LOCATIONS |
| | WITHIN THE CITY THAT MEET THE CITY CODE REQUIREMENTS. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446 |
| | [email protected] |
| | |