| 2022-01-20 09:35:02 | 1. PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED |
| | SURVEYOR, WHICH SHOWS THE POLE LOCATION, UNDERGROUND |
| | CONDUIT PATH, AND THE RIGHT-OF-WAY LINE SO THAT STAFF |
| | CAN VERIFY THAT THE WIRELESS COMMUNICATION FACILITY AND |
| | UNDERGROUND ELECTRIC CONNECTIONS ARE WITHIN THE |
| | RIGHT-OF-WAY AND NOT ON PRIVATE PROPERTY. |
| | - PLEASE PROVIDE A COMPLETE SURVEY SHOWING THE FULL |
| | SCOPE OF WORK. |
| | |
| | 2. THE SUBMITTED COMMUNICATION FACILITY PLACEMENT |
| | PERMIT - CITY RIGHTS-OF-WAY MUST BE APPROVED PRIOR TO |
| | THIS PERMIT BEING APPROVED. THE PLANS INCLUDED WITH |
| | THIS ELECTRICAL PERMIT MUST MATCH THE PLANS APPROVED |
| | WITH THE AFOREMENTIONED PERMIT. |
| | |
| | 3. SHEET T1 LISTS THE SCOPE OF WORK INCLUDES THE |
| | INSTALLATION OF AN ENCLOSURE CABINET. SHEET C4 IS |
| | LABELED AS ?ENCLOSURE DETAILS? BUT THE PLAN DOESN?T |
| | SEEM TO SHOW AN ENCLOSURE CABINET. PLEASE CLARIFY WHAT |
| | THIS MEANS, IS THE ?CABINET? JUST THE RADIO BAYS AND |
| | METER/EQUIPMENT ACCESS? THE CITY DOES NOT PERMIT |
| | FREESTANDING OR POLE MOUNTED CABINETS. |
| | |
| | 4. POLE STEALTH DESIGN MEETS CITY STANDARDS. |
| | |
| | NOTE: PRIOR TO BEGINNING THE PLACEMENT OF THE POLE, THE |
| | UNDERGROUND FIBER, THE HANDHOLES, ETC. A RIGHT-OF-WAY |
| | USE PERMIT MUST BE APPROVED BY THE CITY'S ENGINEERING |
| | SERVICES DIVISION. |
| | |
| | |
| | CHRIS KIMMERLY @ (561) 822-1426 |
| | [email protected] |
| | |