| Plan Review Notes For Permit 20101168 |
| Permit Number |
20101168 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-11-03 17:39:19 | RESIDENTIAL (R3) BUILDING REVIEW COMMENTS | | | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. | | | | | | NOTE: SEC. 702.6 FBC-EXISTING BUILDING. ALL NEW WORK | | | SHALL COMPLY WITH THE MATERIALS AND METHODS | | | REQUIREMENTS IN THE FLORIDA BUILDING CODE. | | | | | | SHUTTERS INSTALLATION SCHEDULE SUBMITTED: | | | 1- CONTRACTOR SPECIFIES UNDER THE SUBSTRATE COLUMN THAT | | | THERE IS A "SOLID CONCRETE TOP BEAM". THERE ARE NOT | | | SPECIFICATIONS FOR THE SUBSTRATE AT THE BOTTOM OF THE | | | OPENING. TYPICALLY, THE CONCRETE ANCHOR SCHEDULE IS | | | USED FOR TOP ANCHORS AND CONCRETE BLOCK ANCHOR SCHEDULE | | | IS USED FOR BOTTOM ANCHORS UNLESS CONTRACTOR PROVES | | | THAT THE OPENING SILL IS CONCRETE WITH THE REQUIRED | | | CONCRETE STRENGTH. | | | CONTRACTOR IS USING THE SAME CONCRETE ANCHOR SCHEDULE | | | FOR TOP AND BOTTOM ANCHOR SPACING. REVISE ANCHOR | | | SPACING AS REQUIRED OR PROVIDE DETAILS OF THE OPENING | | | SILL CONSTRUCTION INCLUDING THE STRENGTH OF THE | | | CONCRETE. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|