| Plan Review Notes For Permit 20100983 |
| Permit Number |
20100983 |
|
| Review Stop |
Z |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-11-16 17:05:37 | FAILED | | | | | | 1) PROVIDE THE SETBACK FROM THE PROPERTY LINE TO THE | | | POSTS FOR THE ROOF ALONG THE NORTH SIDE OF THE | | | BUILDING. THE OUTSIDE FACE OF THE POST NEEDS TO BE AT | | | LEAST 25 FEET FROM THE NORTHERN PROPERTY LINE. | | | | | | 2) THE SETBACK FOR THE BUILDING ON SHEET SP.0.1-1 FROM | | | THE NORTH PROPERTY LINE DOES NOT MATCH THE APPROVED | | | SITE PLAN. ALL PLANS MUST SHOW ACCURATE CONDITIONS. | | | | | | 3) SEPARATE PERMITS ARE REQUIRED FOR: | | | | | | A. PARKING LOT STRIPPING | | | B. BASKETBALL COURT AND HARDSCAPE | | | C. LANDSCAPE | | | D. IRRIGATION | | | E. GAZEBO | | | F. BICYCLE RACKS | | | G. GENERATOR | | | H. DUMPSTER ENCLOSURE | | | I. FENCES | | | J. SIGNS | | | K. SITE LIGHTING | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] |
|