| 2020-12-14 18:21:26 | 12/14/20 2ND LP GAS REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. THE SIZING TABLES SUBMITTED REFER TO THE GAS CODE |
| | 2018 AND WE ARE IN 2017. THERE IS NO SIZING TABLE |
| | REFERENCED ON THE PLAN FOR THE PE PIPE FROM THE LP TANK |
| | TO THE STRUCTURE. |
| | |
| | 2. THERE ARE NO PLANS OR DOCUMENTS ON RECORD THAT FOR |
| | THIS LP TANK INSTALLATION. HOWEVER, A PERMIT WAS |
| | ISSUED, AND INSPECTIONS WERE DONE ON THIS LP TANK. |
| | STILL, THAT ONE WAS FOR THE STAND-ALONE BUILDING, THE |
| | CHIPOTLE RESTAURANT; A SEPARATE PERMIT AND INSPECTION |
| | WILL NEED TO BE DONE FOR THIS BUILDING PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 105.1. |
| | |
| | 3. THE SECOND REQUEST PLEASE SUBMIT COMPLETE |
| | SPECIFICATIONS AND INSTALLATION DETAILS FOR THE |
| | INSTALLATION OF THE LP TANK. THE INFORMATION ON THIS |
| | PERMIT IS FROM PERMIT 19081537, AND IT CAN NOT BE USED |
| | PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1 |
| | INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 4. THE SECOND REQUEST, SUBMIT THE MANUFACTURER'S |
| | SPECIFICATIONS AND INSTALLATION INSTRUCTIONS FOR THE |
| | PRESSURE REGULATORS. REGULATORS INSTALLED ON THE |
| | EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR |
| | INSTALLATION. IDENTIFY ON THE SPECIFICATION SHEETS |
| | WHICH MODEL REGULATOR IS BEING INSTALLED AND THE |
| | ORIFICE SIZE TO ENSURE THE REGULATOR CAN ACCOMMODATE |
| | THE BTU LOAD THROUGH THE REGULATOR.2017 FGC SEC.410.1. |
| | |
| | 5. THE SECOND REQUEST, PLEASE SHOW THE DEPTH OF THE LP |
| | GAS CONTAINER BELOW GRADE. COMPLY WITH NFPA 58 SEC. |
| | 6.6.6.1. |
| | |
| | 6. THE SECOND REQUEST, PLEASE PROVIDE THE SIZE OF THE |
| | HOLD-DOWN CABLES/STRAPS FOR THE TANK AND THE TYPE AND |
| | LENGTH OF GROUND ANCHORS TO BE INSTALLED TO PREVENT |
| | FLOTATION. NFPA 58 SEC. 6.6.1.6. |
| | |
| | 7. THE SECOND REQUEST, PLEASE PROVIDE A CATHODIC |
| | PROTECTION SYSTEM SHALL BE REQUIRED PER NFPA 58 SECS. |
| | 5.2.1.11, 6.6.6.1 (I) AND SHALL BE MONITORED PER NFPA |
| | 58 SEC.6.6.6.1 (J). SUBMIT DETAILS ON THE TYPE OF |
| | CATHODIC PROTECTION, SIZE (LBS) & A NUMBER OF MAGNESIUM |
| | BAG(S), SIZE & TYPE OF ANODE CABLE. NFPA 58 SEC. |
| | 6.17.3. |
| | |
| | 8. THE TANK IS IN A PARKING LOT; PLEASE PROVIDE WHICH |
| | COVER, AND THE MANUFACTURER'S SPECIFICATION USED TO |
| | PROTECT THE TANK IN THE LOCATION, PROVIDED WITH |
| | VEHICULAR BARRIER PROTECTION FOR THE CONTAINERS FITTING |
| | HOUSING, HOUSING COVER PER THE NFPA 58-14 SEC. 6.6.6.1 |
| | (C). |
| | |
| | 9. WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE |
| | INSTALLED WITHIN ONE (1) FOOT OF EITHER SIDE OF THE MP |
| | REGULATOR PER THE 2017 FBC-FUEL GAS SEC. 410.2 (7). |
| | |
| | 10. THE SECOND REQUEST INDICATES THE PLAN IF THE LP |
| | TANK IS ABOVE GROUND OR BELOW GROUND AND SHOWS THE |
| | METHOD OF MANDATORY PROTECTION FOR THE LP TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK IS BELOW GROUND, |
| | IT SHALL BE ANCHORED PER NFPA 58 SEC.3-2.2.7 (H). IF |
| | ABOVE GROUND, THE TANK SHALL BE SECURELY ANCHORED TO |
| | WITHSTAND 170 MPH ULT WIND LOAD PER THE FLORIDA |
| | BUILDING CODE. |
| | |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES. |
| | A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |