Plan Review Notes
Plan Review Notes For Permit 20100804
Permit Number 20100804
Review Stop G
Sequence Number 2
Notes
Date Text
2020-12-14 18:21:2612/14/20 2ND LP GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THE SIZING TABLES SUBMITTED REFER TO THE GAS CODE
 2018 AND WE ARE IN 2017. THERE IS NO SIZING TABLE
 REFERENCED ON THE PLAN FOR THE PE PIPE FROM THE LP TANK
 TO THE STRUCTURE.
  
 2. THERE ARE NO PLANS OR DOCUMENTS ON RECORD THAT FOR
 THIS LP TANK INSTALLATION. HOWEVER, A PERMIT WAS
 ISSUED, AND INSPECTIONS WERE DONE ON THIS LP TANK.
 STILL, THAT ONE WAS FOR THE STAND-ALONE BUILDING, THE
 CHIPOTLE RESTAURANT; A SEPARATE PERMIT AND INSPECTION
 WILL NEED TO BE DONE FOR THIS BUILDING PER THE WPB
 AMENDMENTS TO THE FBC SEC. 105.1.
  
 3. THE SECOND REQUEST PLEASE SUBMIT COMPLETE
 SPECIFICATIONS AND INSTALLATION DETAILS FOR THE
 INSTALLATION OF THE LP TANK. THE INFORMATION ON THIS
 PERMIT IS FROM PERMIT 19081537, AND IT CAN NOT BE USED
 PER THE WPB AMENDMENTS TO THE FBC SEC. 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 4. THE SECOND REQUEST, SUBMIT THE MANUFACTURER'S
 SPECIFICATIONS AND INSTALLATION INSTRUCTIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION. IDENTIFY ON THE SPECIFICATION SHEETS
 WHICH MODEL REGULATOR IS BEING INSTALLED AND THE
 ORIFICE SIZE TO ENSURE THE REGULATOR CAN ACCOMMODATE
 THE BTU LOAD THROUGH THE REGULATOR.2017 FGC SEC.410.1.
  
 5. THE SECOND REQUEST, PLEASE SHOW THE DEPTH OF THE LP
 GAS CONTAINER BELOW GRADE. COMPLY WITH NFPA 58 SEC.
 6.6.6.1.
  
 6. THE SECOND REQUEST, PLEASE PROVIDE THE SIZE OF THE
 HOLD-DOWN CABLES/STRAPS FOR THE TANK AND THE TYPE AND
 LENGTH OF GROUND ANCHORS TO BE INSTALLED TO PREVENT
 FLOTATION. NFPA 58 SEC. 6.6.1.6.
  
 7. THE SECOND REQUEST, PLEASE PROVIDE A CATHODIC
 PROTECTION SYSTEM SHALL BE REQUIRED PER NFPA 58 SECS.
 5.2.1.11, 6.6.6.1 (I) AND SHALL BE MONITORED PER NFPA
 58 SEC.6.6.6.1 (J). SUBMIT DETAILS ON THE TYPE OF
 CATHODIC PROTECTION, SIZE (LBS) & A NUMBER OF MAGNESIUM
 BAG(S), SIZE & TYPE OF ANODE CABLE. NFPA 58 SEC.
 6.17.3.
  
 8. THE TANK IS IN A PARKING LOT; PLEASE PROVIDE WHICH
 COVER, AND THE MANUFACTURER'S SPECIFICATION USED TO
 PROTECT THE TANK IN THE LOCATION, PROVIDED WITH
 VEHICULAR BARRIER PROTECTION FOR THE CONTAINERS FITTING
 HOUSING, HOUSING COVER PER THE NFPA 58-14 SEC. 6.6.6.1
 (C).
  
 9. WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE
 INSTALLED WITHIN ONE (1) FOOT OF EITHER SIDE OF THE MP
 REGULATOR PER THE 2017 FBC-FUEL GAS SEC. 410.2 (7).
  
 10. THE SECOND REQUEST INDICATES THE PLAN IF THE LP
 TANK IS ABOVE GROUND OR BELOW GROUND AND SHOWS THE
 METHOD OF MANDATORY PROTECTION FOR THE LP TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK IS BELOW GROUND,
 IT SHALL BE ANCHORED PER NFPA 58 SEC.3-2.2.7 (H). IF
 ABOVE GROUND, THE TANK SHALL BE SECURELY ANCHORED TO
 WITHSTAND 170 MPH ULT WIND LOAD PER THE FLORIDA
 BUILDING CODE.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR