2020-11-13 09:26:151) ) SUBMIT TWO COPIES OF THE APPLICABLE SIZING TABLES
 USED TO SIZE THE GAS SYSTEM OR PLACE A NOTE ON THE
 PLANS/DRAWINGS SPECIFYING WHICH SIZING TABLE(S) FROM
 THE GAS CODE OR OTHER STANDARD THAT WERE USED IN THE
 DESIGN OF THIS GAS SYSTEM. REFER TO THE 2017 FBC-FUEL
 GAS SECS. 401.4, 401.8, 402.3, AND TABLES 402.4 (1)
 THRU 402.4 (37) OR 2017 FBC-RES. SEC. G2413.3, G2412.8,
 G2413.1, G2413.2, & G2413.3. NOTE: THERE IS NO SIZING
 TABLE REFERENCED ON THE PLAN FOR THE PE PIPE FROM THE
 LP TANK TO THE STRUCTURE.
 2) SUBMIT A CPPY OF THE SITE/CIVIL PLAN THAT SHOWS THE
 LOCATION OF THE "EXISTING LP TANK." NOTE: THERE WAS
 NEVER A GAS PLAN REVIEW DONE ON THE PERMIT FOR THE LP
 TANK. IN ADDITION, THERE ARE NO PLANS OR DOCUMENTS ON
 RECORD THAT I COULD FIND FOR THIS LP TANK INSTALLATION
 ALTHOUGH A PERMIT WAS ISSUED AND INSPECTIONS WERE DONE
 ON THIS LP TANK.
 3) SUBMIT COMPLETE SPECIFICATIONS AND INSTALLATION
 DETAILS FOR THE INSTALLAION OF THE LP TANK.
 4) SUBMIT MANUFACTURER?S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING
 SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON
 THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING
 INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR
 CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017
 FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1.
 5) SHOW THE DEPTH OF THE LP GAS CONTAINER BELOW GRADE.
 COMPLY WITH NFPA 58 SEC. 6.6.6.1.
 6) PROVIDE THE SIZE OF THE HOLD-DOWN CABLES/STRAPS FOR
 THE TANK AND THE TYPE AND LENGTH OF GROUND ANCHORS TO
 BE INSTALLED TO PREVENT FLOTATION. NFPA 58 SEC.
 6.6.1.6.
 7) A CATHODIC PROTECTION SYSTEM SHALL BE REQUIRED PER
 NFPA 58 SECS. 5.2.1.11, 6.6.6.1 (I) AND SHALL BE
 MONITORED PER NFPA 58 SEC.6.6.6.1 (J). SUBMIT DETAILS
 ON THE TYPE OF CATHODIC PROTECTION, SIZE (LBS) & NUMBER
 OF MAGNESIUM BAG(S), SIZE & TYPE OF ANODE CABLE. NFPA
 58 SEC. 6.17.3.
 8) ) INSTALLATIONS WITHIN 10 FT (3 M) OF A PUBLIC
 VEHICULAR THOROUGHFARE OR DESIGNATED PARKING LOCATION
 SHALL BE PROVIDED WITH VEHICULAR BARRIER PROTECTION FOR
 THE CONTAINER?S FITTING HOUSING, HOUSING COVER,
 CONTAINER CONNECTIONS, AND PIPING. NFPA 58-14 SEC.
 6.6.6.1 (C).
 9) WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE
 INSTALLED WITHIN ONE (1) FOOT OF EITHER SIDE OF THE MP
 REGULATOR. 2017 FBC-RESIDENTIAL SEC. G2421.2 (7), 2017
 FBC-FUEL GAS SEC. 410.2 (7).
 10) CLEARLY SHOW THE LOCATION AND CAPACITY OF LP
 TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF
 THE TANK FROM THE EXTERIOR BUILDING WALL AND ADJACENT
 PROPERTY LINES, THE DISTANCE OF THE TANK FROM ALL
 SOURCES OF IGNITION, OTHER CONTAINERS, BUILDINGS, AND
 THE LOCATION OF ANY BUILDING OPENINGS BELOW THE RELIEF
 VALVE OF THE TANK PER NFPA 58, TABLE 3-2.2.2.
 11) CLEARLY INDICATE ON THE PLAN IF THE LP TANK IS
 ABOVE GROUND OR BELOW GROUND AND SHOW THE METHOD OF
 REQUIRED PROTECTION FOR THE LP TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK IS BELOW GROUND IT SHALL BE
 ANCHORED PER NFPA 58 SEC.3-2.2.7 (H). IF ABOVE GROUND,
 THE TANK SHALL BE SECURELY ANCHORED TO WITHSTAND 170
 MPH ULT WIND LOAD PER THE FLORIDA BUILDING CODE.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved