Date Text
2020-11-05 11:25:44PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SIXTH EDITION (2017)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE BUILDING IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA. THE FLOOD ZONE IS AE AND THE BFE IS 14' NAVD88.
 THE REQUIRED DFE IS 16' NAVD88. THE BUILDING AND ALL OF
 THE EQUIPMENT SERVICING IT ARE REQUIRED TO BE AT OR
 ABOVE THE DFE, 16' NAVD88. ELEVATION CERTIFICATES ARE
 REQUIRED. AN ELEVATION CERTIFICATE BASED ON
 CONSTRUCTION DRAWINGS IS REQUIRED BEFORE THE PERMIT IS
 ISSUED. AS OF OCTOBER 5TH, 2017, THE CITY HAS ADOPTED
 NEW FLOOD INSURANCE RATE MAPS WHICH USE NAVD 88 AS THE
 VERTICAL DATUM. THE CITY ALSO ADOPTED A 2' FREEBOARD
 WHICH REQUIRES THE FINISH FLOOR AND EQUIPMENT TO BE A
 MINIMUM OF TWO FEET ABOVE THE BFE. ACCORDING TO THE
 FLOOD INSURANCE RATE MAP WHICH WAS ADOPTED ON OCTOBER
 5, 2017 AND IS APPLICABLE TO THIS PROJECT, THE
 STRUCTURE IS IN AN AE FLOOD ZONE WHICH IS A SPECIAL
 FLOOD HAZARD AREA. THE CITY OF WEST PALM BEACH HAS
 ADOPTED A FLOOD ORDINANCE THAT REQUIRES A TWO (2) FOOT
 FREE BOARD. SPECIFY ALL ELEVATIONS IN NAVD 88.
 THREE ELEVATION CERTIFICATES ARE REQUIRED TO BE
 SUBMITTED. 1) A PRE-CONSTRUCTION ELEVATION CERTIFICATE
 BASED ON THE CONSTRUCTION PLANS IS REQUIRED BEFORE THE
 PERMIT IS ISSUED. 2) A BUILDING UNDER CONSTRUCTION
 ELEVATION CERTIFICATE WHEN FIRST FLOOR SLABS ARE
 POURED. 3) A FINISHED CONSTRUCTION ELEVATION WHEN THE
 JOB IS COMPLETE INCLUDING LANDSCAPING. THE FINAL
 ELEVATION CERTIFICATE IS REQUIRED TO BE SUBMITTED AND
 APPROVED BEFORE THE C.O. WILL BE ISSUED.
  
 2) SHEET MK-1 OF THE PLANS SPECIFY THAT THIS BUILDING
 IS TYPE V-A CONSTRUCTION AND IS NOT SPRINKLERED. FBC
 TABLE 601 REQUIRES THE ROOF CONSTRUCTION AND SECONDARY
 MEMBERS TO HAVE A ONE HOUR FIRE RESISTIVE RATING. THE
 WOOD TRUSSES AND PLYWOOD DECKING DO NOT MEET THIS
 REQUIREMENT. TYPE V-B CONSTRUCTION MAY BE AN
 ALTERNATIVE.
  
 3) SECTION 4.2 ON THE GEOTECHNICAL REPORT STATES THAT
 THE FOOTINGS SHOULD BOTTOM AT LEAST 18" BELOW FINAL
 GRADE. SHOW HOW THIS BUILDING WILL MEET THIS
 REQUIREMENT. FBC 107.2
  
 4) SECTION 1 ON SHEET S-MK.2, SHOWS THE BOTTOM OF THE
 FOOTER 8" BELOW GRADE. FBC REQUIRES THE BOTTOM OF
 FOOTINGS TO BE A MINIMUM OF 12" BELOW GRADE. FBC 1809.5
  
 5) THE WIND PRESSURE DIAGRAM FOR THE ROOF ON SHEET
 S-MK.2, IS FOR A GABLE ROOF AND THIS BUILDING HAS A
 GABLE ROOF. FBC 107.2 AND FBC CHAPTER 16
  
 6) PROVIDE A LIFE SAFETY PLAN. THE LIFE SAFETY PLAN
 NEEDS TO SHOW THE FOLLOWING:
 A) NUMBER OF OCCUPANTS IN EACH AREA FBC 1004.1
 B) CUMULATIVE OCCUPANT LOADS FBC 1004.1.1
 C) EXIT SEPARATION DISTANCE FBC 1015.2.1
 D) COMMON PATH OF EGRESS TRAVEL DISTANCE FBC 1014.3
 E) EXIT ACCESS TRAVEL DISTANCE FBC 1016.3
 F) CLEAR WIDTH OF THE EXIT OR EXIT ACCESS DOORS FBC
 1008.1.1
 G) CAPACITY OF EGRESS DOORS, OCCUPANT LOAD SERVED AND
 MEANS OF EGRESS FACTOR FBC1005.3.2
 H) DISTRIBUTION OF EGRESS CAPACITY FBC1005.5
  
 6) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS
 FOR THOSE PRODUCTS WHICH ARE REGULATED BY FAC
 61G20-3.001 PER FLORIDA STATUTE 553.842 (5) THAT HAVE
 BEEN REVIEWED AND APPROVED IN WRITING BY THE DESIGNER
 OF RECORD. PROVIDE TWO COMPLETE PRODUCT APPROVALS WITH
 FL OR NOA NUMBERS INCLUDING INSTALLATION INSTRUCTIONS
 AND MAXIMUM DESIGN PRESSURES FOR EACH OF THE DIFFERENT
 ROOFING MATERIALS, WINDOW (GLASS TYPES), STRUCTURAL
 MULLIONS AND EXTERIOR DOOR TYPES. THESE ITEMS CAN BE
 DEFERRED IF REQUESTED, HOWEVER, THE DOCUMENTS MUST BE
 SUBMITTED AND APPROVED BY THE BUILDING DEPARTMENT
 BEFORE THEY CAN BE INSTALLED. ONLY ONE SET IS REQUIRED
 TO BE UPLOADED FOR ELECTRONICALLY SUBMITTED DOCUMENTS.
  
 7) SUBMIT TRUSS DRAWINGS AND A TRUSS LAYOUT PLAN. FBC
 2303.4
  
 8) FBC 107.3.4.1 DEFERRED SUBMITTALS. FOR THE PURPOSES
 OF THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS
 THOSE PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT
 THE TIME OF THE APPLICATION AND THAT ARE TO BE
 SUBMITTED TO THE BUILDING OFFICIAL WITHIN A SPECIFIED
 PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE
 PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 9) SUBMIT STRUCTURAL CONSTRUCTION DRAWING WITH
 REINFORCING DETAILS FOR THE MASONRY GABLE END PARAPETS
 WITH THE ARCHED TOPS. FBC 107.2 AND FBC 1609.
  
 10) WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A
 RESPONSE LETTER ADDRESSING EACH ITEM ALONG WITH THE
 CITY RE-SUBMITTAL FORM.
  
  