| 2020-11-22 08:27:08 | 1) SUBMIT COPIES OF THE MANUFACTURER'S SPECIFICATION |
| | SHEETS FOR ALL GAS EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND FBC-2017 FUEL GAS CODE |
| | SEC. 402.2, AND 301.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, |
| | 2) SHT. P3-01 - KEYNOTE #1 STATES THE LP GAS DEMAND IS |
| | 1182 MBH BUT THE GAS LOAD SUMMARY TABLE SHOWS 812 MBH. |
| | CLARIFY. |
| | 3) SHT. P3-01 - THE GAS LOAD SUMMARY TABLE INDICATES |
| | LIQUID PROPANE GAS BUT THE TABLE ALSO REFERSS TO |
| | NATURAL GAS. CLARIFY. |
| | 4) SHT. P3-01 - THE GAS LOAD SUMMARY TABLE NOTES THE |
| | TOTAL DEVELOPED LENGTH AS 82 FEET BUT KEYNOTE #1 STATES |
| | THE DEVELOPED LENGTH IS 126 FEET.THE PLANS FOR PERMIT |
| | APPLICATION #20100804 FOR THIS SAME SPACE SHOW THE |
| | DEVELOPED LENGTH AS 75 FEET.CLARIFY. |
| | 5) SHT. P4-01 - THE GAS RISER REFERENCES SIZING TABLE |
| | 402.4(26) FROM THE FUEL GAS CODE. THIS TABLE IS FOR A |
| | 10 PSI SYSTEM BUT THE PLAN REFERS TO AN 11 INCH WATER |
| | COLUMN PRESSURE. CLARIFY. NOTE: A COMPREHENSIVE GAS |
| | REVIEW COUD NOT BE DONE AT THIS TIME DDUE TO THE WRONG |
| | SIZING TABLE REFERENCED ON THE PLANS. |
| | 6) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED.WPB |
| | AMEND. TO FBC SEC. 107.2.1. |
| | 7) SUBMIT DETAILS FOR THE ANCHORING OF THE GAS PIPING |
| | ON THE ROOF.GAS PIPING INSTALLED ON THE ROOF SHALL |
| | OMPLY WITH FBC-FUEL GAS SEC.404.9. |
| | 8) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE GAS |
| | APPLIANCES. 2017 FBC-FUEL GAS SEC. 304.1. WHERE |
| | COMBUSTION AIR IS PROVIDED BY THE BUILDING?S MECHANICAL |
| | VENTILATION SYSTEM, THE SYSTEM SHALL PROVIDE THE |
| | SPECIFIED COMBUSTION AIR RATE IN ADDITION TO THE |
| | REQUIRED VENTILATION AIR. 2017 FBC-FUEL GAS |
| | SEC.304.9.3. |
| | 9) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS. |
| | A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY |
| | AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS |
| | SEC.409.4. |
| | 10) SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS. |
| | REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING |
| | SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON |
| | THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING |
| | INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR |
| | CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017 |
| | FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |