Plan Review Notes
Plan Review Notes For Permit 20100363
Permit Number 20100363
Review Stop G
Sequence Number 1
Notes
Date Text
2020-11-22 08:27:081) SUBMIT COPIES OF THE MANUFACTURER'S SPECIFICATION
 SHEETS FOR ALL GAS EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND FBC-2017 FUEL GAS CODE
 SEC. 402.2, AND 301.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1,
 2) SHT. P3-01 - KEYNOTE #1 STATES THE LP GAS DEMAND IS
 1182 MBH BUT THE GAS LOAD SUMMARY TABLE SHOWS 812 MBH.
 CLARIFY.
 3) SHT. P3-01 - THE GAS LOAD SUMMARY TABLE INDICATES
 LIQUID PROPANE GAS BUT THE TABLE ALSO REFERSS TO
 NATURAL GAS. CLARIFY.
 4) SHT. P3-01 - THE GAS LOAD SUMMARY TABLE NOTES THE
 TOTAL DEVELOPED LENGTH AS 82 FEET BUT KEYNOTE #1 STATES
 THE DEVELOPED LENGTH IS 126 FEET.THE PLANS FOR PERMIT
 APPLICATION #20100804 FOR THIS SAME SPACE SHOW THE
 DEVELOPED LENGTH AS 75 FEET.CLARIFY.
 5) SHT. P4-01 - THE GAS RISER REFERENCES SIZING TABLE
 402.4(26) FROM THE FUEL GAS CODE. THIS TABLE IS FOR A
 10 PSI SYSTEM BUT THE PLAN REFERS TO AN 11 INCH WATER
 COLUMN PRESSURE. CLARIFY. NOTE: A COMPREHENSIVE GAS
 REVIEW COUD NOT BE DONE AT THIS TIME DDUE TO THE WRONG
 SIZING TABLE REFERENCED ON THE PLANS.
 6) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED.WPB
 AMEND. TO FBC SEC. 107.2.1.
 7) SUBMIT DETAILS FOR THE ANCHORING OF THE GAS PIPING
 ON THE ROOF.GAS PIPING INSTALLED ON THE ROOF SHALL
 OMPLY WITH FBC-FUEL GAS SEC.404.9.
 8) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE GAS
 APPLIANCES. 2017 FBC-FUEL GAS SEC. 304.1. WHERE
 COMBUSTION AIR IS PROVIDED BY THE BUILDING?S MECHANICAL
 VENTILATION SYSTEM, THE SYSTEM SHALL PROVIDE THE
 SPECIFIED COMBUSTION AIR RATE IN ADDITION TO THE
 REQUIRED VENTILATION AIR. 2017 FBC-FUEL GAS
 SEC.304.9.3.
 9) SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR. 2017 FBC-FUEL GAS
 SEC.409.4.
 10) SUBMIT MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS.
 REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING
 SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON
 THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING
 INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR
 CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017
 FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved