| Date |
Text |
| 2020-10-01 15:29:16 | 010/01/20 1ND PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. A SUB IRRIGATION PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | |
| | 2. PLEASE PROVIDE CALCULATIONS FOR STORM DRAIN SIZING |
| | INCLUDING THE EXISTING THAT THE NEW DRAIN IS TO CONNECT |
| | TO. INCLUDE THE IMPACT OF THE IRRIGATION SYSTEM ON THE |
| | DRAINAGE SYSTEM. |
| | |
| | 3. PLEASE DETAIL OR PROVIDE SPECIFIC SPECIFICATION AND |
| | TESTING STANDARDS IF CORRUGATED PIPE AND FITTINGS WILL |
| | BE USED TO PECULATE WATER FROM PLANTER IN COMPLIANCE |
| | WITH FBC PL TABLES 702.1 AND 702.4. |
| | |
| | 4. PLEASE PROVIVE WHERE ALL STORM DRAIN CONNECTIONS ARE |
| | SHOWN ON THE SITE/CIVIL DRAWINGS PER THE WPB FBC |
| | 107.2.1. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |